People can specifically monitor the time and location of traffic diversion in the image above.

Accordingly, this cycling race will officially take place from April 3, 2025 to April 30, 2025 with a total of 25 stages on a total route of 3,052km and mark the participation of 15 racing teams.

On April 12, the Organizing Committee of the Race organized stage 9, Truong Tien - Phu Xuan circuit with a distance of 2.1km x 20 laps = 42km; around Truong Tien - Phu Xuan bridge. To ensure traffic safety for athletes and people, the authorities will conduct traffic diversion and guide traffic on some streets from 7:30 - 10:30 on the same day.

Specifically, 100% of vehicles are banned from circulating on Le Loi Street (from Phu Xuan Bridge to Truong Tien Bridge) and Truong Tien Bridge.

Tran Hung Dao Street (from Truong Tien Bridge to Phu Xuan Bridge) and Phu Xuan Bridge are closed to half of the road and bridge surface; the remaining part is open to two-way traffic (except cars).

News and photos: MINH NGUYEN

Source: https://huengaynay.vn/kinh-te/xay-dung-giao-thong/phan-luong-giao-thong-phuc-vu-giai-dua-xe-dap-toan-quoc-tranh-cup-truyen-hinh-tp-ho-chi-minh-152498.html