The investment in the Khe Can urban reconstruction project aims to improve the quality of life, upgrade technical and social infrastructure, and aim for sustainable development in the area. The project focuses on improving the transportation system, water supply and drainage, lighting and public utilities to meet the needs of the local people and urban development.
At the same time, the construction will ensure safety, convenience, and be in line with modern planning. Focus on environmental protection, expanding green space, improving wastewater treatment systems to create a clean living environment, solve flooding in the area, improve people's quality of life, ensure social security, and promote sustainable local development.
Regarding the investment scale for compensation and resettlement, there are a total of 449 clearance records, partially clearing 424 records; arranging resettlement for 25 households to be completely cleared.
Regarding construction investment, the infrastructure of the downstream area of Khe Can drainage will be improved to connect traffic and handle drainage in the entire area; open a 7.5m wide road along the constructed Khe Can drainage route; open a 5.0m wide road connecting the existing Khe Can drainage route to alley 150 Nguyen Nhu Hanh; widen a 6.0m road parallel to the railway connecting from the existing Khe Can drainage route to Nguyen Nhu Hanh street; connect Yen Khe 2 street with Nguyen Nhu Hanh street.
FAMILY BLESSINGS
Source: https://baodanang.vn/kinhte/202506/dau-tu-tai-thiet-do-thi-khu-vuc-khe-can-4008096/
Comment (0)