Specifically, the road section to be repaired is located from Km4+750 to Km5+220, on the left side of National Highway 51 (Long Hung ward, Dong Nai province).
The repair is expected to last 4 days, from October 7 to October 10.
![]() |
Repair work was prepared from the evening of October 6. Photo: Department of Construction |
Dong Nai Province Department of Construction noted that during the construction period, traffic volume on this route may be locally restricted.
For safe and convenient travel, the Department of Construction recommends that people, organizations and means of transport proactively research and choose appropriate travel routes before passing through this area.
In particular, all traffic participants are required to strictly follow the instructions of traffic control forces at the scene and comply with temporarily installed signs.
Dang Tung
Source: https://baodongnai.com.vn/xa-hoi/202510/dong-nai-sua-chua-cuc-bo-quoc-lo-51-khuyen-cao-nguoi-dan-chu-dong-lo-trinh-ba34282/
Comment (0)