
At the time of reporting, the above project was still being constructed sluggishly, the sidewalk was dug up by the construction unit, sand, rocks, concrete and sewer pipes were lying around, affecting the landscape and environment as well as the business and daily life of people along both sides of the road...
Up to now, Tran Van Hoai street has been invested in, the road surface is paved with wide asphalt, the sidewalk is clear (photo) , and trade is convenient. Residents on the street are very excited.
News and photos: TT
Source: https://baocantho.com.vn/duong-tran-van-hoai-da-duoc-dau-tu-khang-trang-a193521.html






Comment (0)