After many consecutive heavy rains, the road surface of National Highway 1 and National Highway 19 through Binh Dinh province was damaged in many places, causing traffic insecurity.
Similarly, National Highway 19 through Binh Dinh also has damaged road surfaces. In many locations, the road surface is peeling, "potholes", stagnant water, sagging and rutted with wheel tracks. At Km20+600 - Km30+100 and Km40+00 - Km48+300 through Tay Son district, many potholes, buffalo ridges, and peeling appear. (In the photo, at Km 27+300, Nhon Tan commune intersection, An Nhon town, there are rutted wheel tracks. BOT 36.71 Company Limited is peeling off the damaged asphalt layer and redoing the concrete base to create a smooth road surface here).
Source: https://www.baogiaothong.vn/mat-duong-cac-tuyen-quoc-lo-qua-binh-dinh-hu-hong-sau-mua-lon-duoc-khac-phuc-ra-sao-192241122113140327.htm
Comment (0)