Vietnam.vn - Nền tảng quảng bá Việt Nam

Concrete exposed iron frame, overgrown grass in Da Nang coastal tourist area

Báo Dân tríBáo Dân trí28/10/2024


Bê tông trơ khung sắt, cỏ um tùm ở khu du lịch ven biển Đà Nẵng - 1

Construction started 4 years ago and is located on the coast of Da Nang . It was widely promoted, but the Aria Da Nang Hotel & Resort project is now in a state of disrepair, with only a few unfinished buildings left standing as concrete frames.

Bê tông trơ khung sắt, cỏ um tùm ở khu du lịch ven biển Đà Nẵng - 2

Aria Danang Hotel & Resort project is located on Truong Sa street, Hoa Hai ward (Ngu Hanh Son district, Danang) and faces Tan Tra beach.

With its prime location, the project was expected to change the face of this "golden land".

Bê tông trơ khung sắt, cỏ um tùm ở khu du lịch ven biển Đà Nẵng - 3

According to the introduction, the project started construction in January 2020 and is expected to be completed in the fourth quarter of 2022. The investor is Hanoi Non Nuoc Tourism Investment Joint Stock Company and Danh Khoi Group is the project developer.

Bê tông trơ khung sắt, cỏ um tùm ở khu du lịch ven biển Đà Nẵng - 4

According to research, the project has a total investment of about 756 billion VND. The scale of 63,214m2 includes 2 apartment towers of 30 floors, 2 hotels of 9 floors and 28 beach villas, 1 basement connecting 2 apartment towers.

However, according to Dan Tri reporters, currently the project has only built a few unfinished and abandoned buildings, with grass growing wildly inside.

Bê tông trơ khung sắt, cỏ um tùm ở khu du lịch ven biển Đà Nẵng - 5
Bê tông trơ khung sắt, cỏ um tùm ở khu du lịch ven biển Đà Nẵng - 6

Sea view villa with 2-storey architecture, unfinished, mossy brick walls.

Bê tông trơ khung sắt, cỏ um tùm ở khu du lịch ven biển Đà Nẵng - 7

Some items have become places to store rainwater; many concrete pillars are jagged, and machines lie idle in a corner.

According to the reporter's records, currently, the project shows no signs of continuing construction.

Bê tông trơ khung sắt, cỏ um tùm ở khu du lịch ven biển Đà Nẵng - 8
Bê tông trơ khung sắt, cỏ um tùm ở khu du lịch ven biển Đà Nẵng - 9

The steel has been exposed to the sun and rain for many years and is rusty. There are some deep holes and exposed concrete in the project area, which are not covered.

Bê tông trơ khung sắt, cỏ um tùm ở khu du lịch ven biển Đà Nẵng - 10

The investor has fenced the project on the side facing the sea, but the fence is now rusted and badly damaged.

Bê tông trơ khung sắt, cỏ um tùm ở khu du lịch ven biển Đà Nẵng - 11

Location of Aria Danang Hotel & Resort project (Photo: Google Maps).



Source: https://dantri.com.vn/bat-dong-san/be-tong-tro-khung-sat-co-um-tum-o-khu-du-lich-ven-bien-da-nang-20241022160220907.htm

Comment (0)

No data
No data
PIECES of HUE - Pieces of Hue
Magical scene on the 'upside down bowl' tea hill in Phu Tho
3 islands in the Central region are likened to Maldives, attracting tourists in the summer
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?

Heritage

Figure

Business

No videos available

News

Political System

Local

Product