Vietnam.vn - Nền tảng quảng bá Việt Nam

Cat Linh - Ha Dong metro operator reports triple profit thanks to deposit

(Dan Tri) - Hanoi Metro is currently the operator of two metro lines Cat Linh - Ha Dong and Nhon - Hanoi Railway Station.

Báo Dân tríBáo Dân trí06/08/2025

Hanoi Railway One Member Co., Ltd. (Hanoi Metro) has just announced its financial report for the first 6 months of 2025. Hanoi Metro is currently the operator of the two metro lines Cat Linh - Ha Dong and Nhon - Hanoi Station.

In the first half of the year, Hanoi Metro's revenue reached VND393.2 billion, up 54% over the same period. After-tax profit reached approximately VND10 billion, 3 times higher than the same period last year.

Notably, most of the profit does not come from the core passenger transport activity, but mainly from financial revenue. Specifically, the company's financial revenue in the first half of this year reached more than VND 23.6 billion, an increase of 2.6 times over the same period. This revenue comes from interest on deposits and loans. As of June 30, 2025, the company has more than VND 1,200 billion in bank deposits.

Doanh nghiệp vận hành metro Cát Linh - Hà Đông báo lãi gấp 3 nhờ gửi tiền - 1

In 2025, Hanoi Metro targets total revenue of VND878.4 billion, an increase of 40% compared to 2024. The target of pre-tax profit and after-tax profit is VND27 billion and VND20.7 billion.

Thus, in the first 6 months of this year, Hanoi Metro has achieved half of its revenue target, and nearly 50% of its after-tax profit target.

The Cat Linh - Ha Dong metro line is 13km long, running above ground through 12 stations. Each train has 4 carriages, carrying 960 people, maximum speed 80km/h, operating speed 35km/h. The train takes 23 minutes to travel the entire route.

The Nhon - Hanoi Railway Station metro line has a total length of 12.5km. Of which, the elevated section (Nhon - Cau Giay) is 8.5km long and the underground section (Cau Giay - Hanoi Railway Station) is 4km long. The train has a maximum speed of 80km/h, an average operating speed of 35km/h, carrying about 950 passengers.

Source: https://dantri.com.vn/kinh-doanh/doanh-nghiep-van-hanh-metro-cat-linh-ha-dong-bao-lai-gap-3-nho-gui-tien-20250806161056546.htm


Comment (0)

No data
No data
Wild beauty on Ha Lang grass hill - Cao Bang
Vietnam Air Force practices preparing for A80
Missiles and combat vehicles 'Made in Vietnam' show off their power at A80 joint training session
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2

Heritage

Figure

Business

No videos available

News

Political System

Destination

Product