![]() |
| Khanh Hoa Power Joint Stock Company organized a launching ceremony to support Dak Lak in restoring the power grid after the storm. |
The unit sent 60 officers, engineers, workers and 4 cranes, 4 cars carrying materials, equipment, tools, and construction tools to support the repair of damage to the power grid in the Song Cau area, Dak Lak province. Immediately after the launching ceremony, the shock team quickly moved, ready to coordinate with member units of the Central Power Corporation and Dak Lak Power Company to deploy plans to fix the problem, rebuild electric poles, pull wires, replace damaged equipment, ensuring the safest, fastest and most effective power restoration.
It is known that after the 13th storm passed, hundreds of medium and low voltage power poles were broken, many power lines were damaged, causing widespread power outages in Dak Lak province. On the night of November 6, the leaders of Khanh Hoa Power Joint Stock Company requested relevant units to send human resources to support the Dak Lak province's electricity sector with the goal of restoring power to the affected areas within 3 days. This is the second time the company has sent forces to support provinces in overcoming power grid problems caused by storms and floods in 2025, demonstrating the sense of responsibility and sympathy of the electricity sector for people affected by storms and floods.
![]() |
| Khanh Hoa Power Company held a launch ceremony. |
On the same day, Khanh Hoa Power Company (formerly Ninh Thuan Power Company) also sent a shock team with 51 members and 7 vehicles and materials to support Dak Lak Power Company in overcoming the power grid problem after the storm. All participating forces will coordinate with other units (1,300 members) of the entire Central Power Company to help restore the power grid as soon as possible.
D.LAM
Source: https://baokhanhhoa.vn/kinh-te/202511/nganh-dien-khanh-hoa-ra-quan-ho-tro-dak-lak-khac-phuc-luoi-dien-sau-bao-cb808ad/








Comment (0)