Vietnam.vn - Nền tảng quảng bá Việt Nam

Lien Phuong Road, Ho Chi Minh City: Completed the last 660m connecting to Ring Road 2

The last 660m section on Lien Phuong axis, Thu Duc City is about to open to traffic, promising to relieve traffic pressure and increase connectivity for the High-Tech Park and Phu Huu port.

Báo Lâm ĐồngBáo Lâm Đồng27/10/2025

Overview of the Eastern arterial road

Lien Phuong Road, with a total length of more than 4.3 km, is one of the important traffic axes in the East of Ho Chi Minh City. This road is planned with a common width of about 30 m, equivalent to 4-6 lanes, connecting directly from Cat Lai intersection (intersection of Vo Nguyen Giap - Mai Chi Tho) to Ring Road 2 (Vo Chi Cong). The project's goal is to reduce the increasing traffic pressure and promote inter-regional connectivity.

Panoramic view of Lien Phuong route connecting Hanoi Highway - Ho Chi Minh City Ring Road 2, more than 4.3 km long.
Lien Phuong route connecting Hanoi Highway - Ho Chi Minh City Ring Road 2 has a total length of more than 4.3 km, common width of about 30 m, equivalent to 4 - 6 lanes.

The final 660m knot is untied.

For many years, the entire route has not been able to be opened due to problems at the last 660m section, connecting from the Vo Nguyen Giap - Mai Chi Tho intersection to The Global City urban area. In October 2024, this section officially started construction with a total investment of 260 billion VND, with Masterise Group as the investor.

The road section is designed with modern technical parameters, including a 60 m wide roadbed, a design speed of 60 km/h and a single axle load of 10 tons, meeting the needs of transporting goods and people. The most important item, the Muong Kinh canal overpass, has also been completed.

The 660 m long road is stuck, connecting from the Vo Nguyen Giap - Mai Chi Tho intersection to The Global City urban area.
However, the entire route has not been completed yet due to the 660-meter long section from the Vo Nguyen Giap - Mai Chi Tho intersection connecting to The Global City urban area. Construction of this section will officially begin in October 2024.

Construction progress and completion time

According to the original plan, the project was expected to be technically open to traffic in early 2025. However, due to the construction process, the progress has been adjusted. As of the end of October 2025, the project is in the final stages of completion and is preparing to put into operation and hand over to the city. The completion of the bridge over Muong Kinh canal is an important milestone, ensuring that the entire route will soon be synchronously connected.

The bridge over Muong Kinh canal has been completed, an important part of the project.
The bridge over Muong Kinh canal has been completed.

Impact on regional infrastructure and economy

When officially opened to traffic, Lien Phuong route will create a complete connecting axis, bringing many economic and social benefits:

  • Reduce congestion: Share traffic volume for parallel routes such as Ho Chi Minh City - Long Thanh - Dau Giay Expressway and Do Xuan Hop Street.
  • Enhanced connectivity: Facilitates travel from Ho Chi Minh City High-Tech Park, Phu Huu Port to the city center and vice versa.
  • Shorten time: Significantly reduce travel time to Ho Chi Minh City center and in the future Long Thanh international airport.
The project has completed the route, prepared for handover and put into use.
The project has completed the route, prepared for handover and put into use.

Real estate projects benefit directly

Developed transport infrastructure is always a lever for the real estate market. The completion of Lien Phuong Road is expected to increase the value of large projects in the area.

The Global City

This is the project that benefits the most from its location directly adjacent to the new road. With a scale of more than 117 hectares, The Global City (formerly known as Saigon Binh An Urban Area) developed by Masterise Homes, includes a variety of product types such as apartments, townhouses, and villas.

The Global City urban area is the project that benefits the most when Lien Phuong route is completed.
The real estate project that will benefit the most when this route is completed is The Global City urban area.

Saigon Sports City

Located next door, the Saigon Sport City project of investor Keppel Land also benefits from this connecting infrastructure. The project has a scale of 64 hectares, planned as a complex of high-end housing, commercial services and public sports facilities.

The 64-hectare Saigon Sport City project also benefits from Lien Phuong route.
Another project that also benefits is Saigon Sport City, which has a scale of 64 hectares, including a commercial service area, a high-end residential area and a public sports area... The project investor is Keppel Land.

Note: Information on real estate projects is for reference only. Buyers and investors need to verify the legal details before making any decisions.

Source: https://baolamdong.vn/duong-lien-phuong-tphcm-hoan-tat-660m-cuoi-noi-vanh-dai-2-398082.html


Comment (0)

No data
No data

Same tag

Same category

Dong Van Stone Plateau - a rare 'living geological museum' in the world
Watch Vietnam's coastal city make it into the world's top destinations in 2026
Admire 'Ha Long Bay on land' just entered the top favorite destinations in the world
Lotus flowers 'dyeing' Ninh Binh pink from above

Same author

Heritage

Figure

Enterprise

High-rise buildings in Ho Chi Minh City are shrouded in fog.

News

Political System

Destination

Product