Mr. Pham Van Cuong, representative of Manh Cuong Company Limited, the unit that carried out the landslide repair, said: Due to the large volume of landslide (estimated at over 10m3 ), immediately after the landslide appeared, the Company arranged 2 excavators and some means of transport to urgently repair the landslide from 2 sides.

Due to the large volume of rock and soil, the landslide site has difficult terrain, while the risk of landslides still exists, so the recovery work is facing many difficulties.


It is known that Nam Xe Commune Police have stretched ropes and temporarily stopped vehicles passing through the landslide area to ensure safety and create conditions for the construction unit to bring machinery to the scene to fix the problem. It is expected that by the end of the afternoon of August 1, the road will be cleared in the first step so that vehicles can temporarily circulate.
Source: https://baolaocai.vn/sat-lo-lon-tren-quoc-lo-279-giao-thong-tu-lao-cai-di-lai-chau-bi-chia-cat-hoan-toan-post650237.html
Comment (0)