Vietnam.vn - Nền tảng quảng bá Việt Nam

Strengthening traffic safety during Tet on highways

Việt NamViệt Nam06/01/2025


Currently, Vietnam Expressway Corporation (VEC) is managing and operating expressways across the country including: Noi Bai - Lao Cai, Cau Gie - Ninh Binh, Da Nang - Quang Ngai, Ho Chi Minh City - Long Thanh - Dau Giay.

VEC requires the operation management units to closely coordinate with the functional forces on the route and the localities where the expressway passes through to ensure traffic order and safety, quickly handle incidents (if any) to ensure smooth traffic.

Strictly handle vehicles parked illegally, motorbikes, pedestrians entering the highway. Especially the situation of motorbike taxis picking up passengers at the entrances to toll stations.

VEC also requires units to carry out the work of clearing and removing trees along both sides of the highway corridor that are at risk of falling, tree branches that obscure the view of markers, signs, cleaning signs, reflective systems, etc. to ensure safe visibility for vehicles traveling on the route.

lao cai 1.jpg
VEC requires units to ensure traffic safety on expressways during the 2025 Tet peak season. Photo: NB

Clean the road surface and sidewalks, ensure the road surface positions on the bridge before and after the toll station area are clean and beautiful.

Absolutely comply with traffic safety and labor safety measures when performing tasks on the route.

In addition, VEC also requested the operating unit to stop construction with contractors and units that do not properly implement approved measures to ensure traffic order and safety.

In particular, units need to develop plans to ensure traffic order and safety, prevent traffic congestion, and assign officers to be on-site to handle arising tasks on highways during Tet.

Lao Cai 2 _ Anh BN.jpg
Organize traffic flow when there is an incident, not to interrupt toll collection activities on VEC's highways. Photo: NB

Regarding toll collection activities on expressways, VEC requires Tasco Joint Stock Company to develop a plan to ensure traffic safety and prevent congestion at toll stations during peak periods before, during and after the Lunar New Year 2025; Proactively review and fix existing problems in the operation of the toll collection system, if any.

Arrange technical staff on duty 24/7 at toll stations on the highway to promptly handle situations and technical problems that may occur with the toll collection system.

Handle lane incidents quickly, ensuring no traffic jams or congestion in toll lanes.

Absolutely ensure traffic safety and labor safety during toll collection operations.

Coordinate with the forces on duty on the route and the functional forces in ensuring traffic safety and security and order at the toll station area. Do not allow motorbike taxis to pick up and drop off passengers before and after the toll station area.

Promptly respond and resolve customer complaints upon receiving feedback.

Bich Dao

Source: https://vietnamnet.vn/tang-cuong-dam-bao-an-toan-giao-thong-dip-tet-tren-duong-cao-toc-2360623.html


Comment (0)

No data
No data

Same tag

Same category

Discover the only village in Vietnam in the top 50 most beautiful villages in the world
Why are red flag lanterns with yellow stars popular this year?
Vietnam wins Intervision 2025 music competition
Mu Cang Chai traffic jam until evening, tourists flock to hunt for ripe rice season

Same author

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product