The inaugurated projects include: Renovation and expansion of the road from Duc Yen Primary School to Dong Tam village gate, Quang Tan commune, with a total length of 1.136km, total investment of over 9 billion VND; according to the scale of internal streets; synchronous investment in lighting system, drainage system, ensuring traffic safety.
Thanh Y Bridge project, Thanh Binh village, Quang Tan commune, has a total designed length of approach road and bridge across the river of 115.50m, of which the bridge section is 51.5m; the bridge is 8m wide; the bridge deck is 7m wide; the bridge deck structure is concrete. The total investment is over 11,711 billion VND.
These are key projects, of special significance in socio -economic development, new rural construction; gradually completing the transportation system; synchronously connecting technical infrastructure, contributing to ensuring social security, improving the quality of culture and local life. In particular, the projects have fundamentally overcome the difficult travel situation, traffic disruption during the rainy and flood season; ensuring safety for people and vehicles; meeting the needs of transporting goods and agricultural products; minimizing traffic accidents and environmental pollution; promoting socio -economic development, enhancing cultural exchange between villages and hamlets with neighboring localities.
Source: https://baoquangninh.vn/xa-quang-tan-gan-bien-cong-trinh-chao-mung-dai-hoi-dai-bieu-dang-bo-xa-3369498.html
Comment (0)