.jpg)
In recent days, many people in Pang Tieng village, Langbiang ward - Da Lat, Lam Dong province have been living in fear as the slope of the pine hill on Provincial Road DT. 721 continues to erode.

The location of the pine hill is on provincial road DT.721 connecting Lang Biang ward - Da Lat (old Lac Duong district) with Dinh Van commune (old Lam Ha district) with a large traffic volume. The residential area is also about 100m away from the landslide site.
In the rainy season of 2024, landslides appeared on the pine hill. In the rainy season of 2025, some small landslides appeared from the top of the hill down.

According to Mr. Bui The, Chairman of Langbiang Ward People's Committee - Da Lat, the taluy area in the pine hill in Pang Tieng village mentioned above has shown signs of landslides since 2024 and the authorities have conducted a survey and assessment of the current situation.
At that time, the People's Committee of the old Lac Duong district proposed using the flood and storm prevention budget to build a slope at the foot of the hill. However, due to the long slope and the high construction cost, the above solution was considered suboptimal. On the other hand, at that time, the authorities assessed that the area was not yet at high risk of landslides.
The Chairman of the People's Committee of Langbiang Ward - Da Lat said that in the coming days, the locality will conduct a re-survey to soon have a specific plan to prevent risks for people as well as propose to the competent agencies and departments a plan to prevent and control if it exceeds the locality's authority.
Source: https://baolamdong.vn/doi-thong-ven-duong-dt-721-co-nguy-co-sat-truot-387473.html
Comment (0)