
Leaders of the Party Committee and People's Committee of the commune, along with representatives of the sponsoring unit and local residents, cut the ribbon to inaugurate the Hoang Thanh 6 bridge.
Hoang Thanh 6 Bridge, located in Hamlet 5, Thanh Loi Commune, is 26m long, 3.5m wide, and has a load capacity of 5 tons. The total construction cost was nearly 320 million VND, and it was completed after 2 months of construction, on schedule and meeting the quality standards of the design.
This project was fully funded by the Ho Chi Minh City Association for the Support of Poor Patients in collaboration with the Phan Thanh - Phan Hoang family (Ho Chi Minh City).
The bridge's opening not only facilitates travel and goods transportation but also plays a crucial role in completing the transportation system, promoting socio-economic development, and improving the lives of local people.

The construction of Hoang Thanh 6 Bridge contributes to the completion of the commune's transportation system.
At the inauguration ceremony, Vice Chairman of the People's Committee of Tran Ngoc An commune thanked the sponsors for their generosity towards the locality, especially in areas still facing many difficulties; and pledged to take care to maintain and maximize the significance of the project.
Thai Tan
Source: https://baolongan.vn/xa-thanh-loi-khanh-thanh-cau-hoang-thanh-6-gop-phan-hoan-thien-ha-tang-giao-thong-a208369.html






Comment (0)