
At Lo Xo Pass area, Ho Chi Minh road, from km 1043-1048, many large landslides appeared, causing traffic congestion lasting into the third day.
Early this morning, October 28, the authorities continued to use specialized vehicles to urgently repair the landslides. However, due to the large volume of landslides, the rugged terrain, and heavy rain, the repair work was very difficult.

On National Highway 1 through Da Nang City, the section is being cut off by floodwaters, so Quang Ngai Traffic Police had to regulate traffic and let vehicles switch to the expressway.
Source: https://quangngaitv.vn/khan-truong-khac-phuc-sat-lo-deo-lo-xo-6509276.html






Comment (0)