Vietnam.vn - Nền tảng quảng bá Việt Nam

Watch video of landslide locations on National Highway 40B after storm No. 13

On the night of November 6, 2025, due to the impact of rain and storm No. 13, Km82 of National Highway (QL) 40B, Da Nang City suffered a landslide, causing traffic jams. Local road management units are focusing on leveling rocks and soil, temporarily filling the road to reopen to traffic on November 7, 2025.

Báo Tin TứcBáo Tin Tức07/11/2025

Vietnam Road Administration ( Ministry of Construction ) informed on the morning of November 7 that Road Management Area III in charge of the National Highways from Quang Ngai to Dak Lak had just reported quickly that as of 8:00 a.m. on November 7, due to the influence of storm No. 13, localities in the area were experiencing heavy rain and strong winds following the storm's circulation.

Video of landslide locations on Highway 40B:

On National Highway 1 and Truong Son Dong Road through Gia Lai and Dak Lak in the storm's eye, there are many fallen trees, electric poles, corrugated iron roofs and objects flying onto the road. The road maintenance units are cutting and clearing them to promptly clear the road. National Highway 1 through Song Cau, Tuy An, Dong Hoa (Dak Lak, Truong Son Dong Road, Gia Lai province) has fallen trees causing local traffic jams.

On Truong Son Dong road, at Dak Po To bridge Km378+130, the M1 bridge abutment has been eroded, the entire road at the bridgehead is not accessible; the section Km390+500-Km391+400 TSĐ Gia Lai has water flooding the road surface from 1.2-1.8 m, completely blocking the road due to flooding; the section Km402-Km402+700 TSĐ Gia Lai has water flooding the road surface on average 1.2-1.4 m, completely blocking the road due to flooding; the section Km404+100-Km404+350 TSĐ Gia Lai has water flooding the road surface on average 1.2-1.4 m, completely blocking the road due to flooding. All flooded areas have been barricaded, road closure signs have been posted, and information has been provided to the local authorities.

QLDB III has informed the Gia Lai Department of Construction and local authorities about the damage and traffic congestion on Truong Son Dong Road and coordinated traffic diversion; arranged staff on site and deployed work to repair Dak Po To Bridge Km378+130; urged field offices and road maintenance units to urgently implement on-site solutions to clear the road as quickly as possible.

QLDB III Area is continuing to update, review, compile statistics and send information to the Vietnam Road Administration.

Source: https://baotintuc.vn/xa-hoi/xem-video-cac-vi-tri-sat-lo-tren-quoc-lo-40b-sau-bao-so-13-20251107090340454.htm


Comment (0)

No data
No data

Same tag

Same category

Close-up of crocodile lizard in Vietnam, present since the time of dinosaurs
This morning, Quy Nhon woke up in devastation.
Hero of Labor Thai Huong was directly awarded the Friendship Medal by Russian President Vladimir Putin at the Kremlin.
Lost in the fairy moss forest on the way to conquer Phu Sa Phin

Same author

Heritage

Figure

Enterprise

Lost in the fairy moss forest on the way to conquer Phu Sa Phin

News

Political System

Destination

Product