.jpg)
Chairman of the People's Committee of Ho Chi Minh City, Le Ngoc Chau, has just signed the approval for the Investment Project to build the intersection between Bui Vien Street and Le Hong Phong Street.
The project is being implemented in Hai An ward, utilizing 5 hectares of existing transportation infrastructure land. This is a Group B project, a Level 1 transportation infrastructure project.
The investor is the Hai Phong Project Management Board for Investment and Construction of Transportation and Agricultural Works. The total investment is 707.1 billion VND from the city budget; the implementation period is from 2024 to 2027.
.jpg)
The project contributes to alleviating traffic congestion and ensuring traffic safety for vehicles passing through the intersection of Bui Vien - Le Hong Phong and Ngo Gia Tu streets. The project helps reduce traffic volume on National Highway 5 through the city center and other routes.
Regarding the scale of investment, the first-level intersection will be constructed in the form of a roundabout with a radius of 30 meters. On Bui Vien Street, an underpass will be built along Bui Vien Street, designed with reinforced concrete and a total length of 485 meters. This includes a 125-meter-long, 27-meter-wide enclosed tunnel with 6 lanes and a design speed of 70 km/hour.
Le Hong Phong and Ngo Gia Tu streets will remain in their current state, with a smooth transition design connecting to the roundabout intersection. Simultaneously, infrastructure projects will be constructed along the route, including: drainage systems, underground drainage pumping stations, street lighting, landscaping, and traffic safety measures.
PHAM CUONGSource: https://baohaiphong.vn/du-an-nut-giao-hien-dai-duong-bui-vien-va-duong-le-hong-phong-co-von-dau-tu-hon-707-ty-dong-520499.html






Comment (0)