Vietnam.vn - Nền tảng quảng bá Việt Nam

Construction of emergency anti-erosion embankment on Tam Tien beach

Việt NamViệt Nam18/03/2024

The emergency coastal erosion control embankment in Ha Loc village is invested by the Provincial Management Board of Investment and Construction of Agricultural and Rural Development Works with a capital of 75 billion VND, to be implemented in 2024.

The project's objective is to invest in building a seawall to prevent coastal erosion in Ha Loc village, ensure the safety of property and lives of people in the project area; contribute to the regeneration of the beach, and develop the socio -economy of the project area.

The scale of construction investment includes a coastal protection embankment about 0.52km long in Ha Loc village; the embankment roof structure is made of precast concrete components, the embankment foot is protected by prestressed piles, the top of the embankment is made of reinforced concrete wave-breaking wall combined with concrete traffic road; the top of the embankment is built with management and operation road and wave-breaking wall to ensure anti-wave overflow at the design frequency; the management road has a concrete structure with a 5m wide road surface...


Source

Comment (0)

No data
No data
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony
S-300PMU1 missiles on combat duty to protect Hanoi's sky
Lotus blooming season attracts tourists to the majestic mountains and rivers of Ninh Binh
Cu Lao Mai Nha: Where wildness, majesty and peace blend together
Hanoi is strange before storm Wipha makes landfall
Lost in the wild world at the bird garden in Ninh Binh
Pu Luong terraced fields in the pouring water season are breathtakingly beautiful
Asphalt carpets 'sprint' on North-South highway through Gia Lai
PIECES of HUE - Pieces of Hue
Magical scene on the 'upside down bowl' tea hill in Phu Tho

Heritage

Figure

Business

No videos available

News

Political System

Local

Product