Vietnam.vn - Nền tảng quảng bá Việt Nam

13,000 billion theater in West Lake: Appearance after 2 months of construction

The Pearl Theater project invested by Sun Group at Dam Tri Lake has leveled the ground for foundation construction, expected to be completed in 2029 and become a new cultural icon.

Báo Lâm ĐồngBáo Lâm Đồng04/12/2025

Overview of the trillion-dollar project on Quang An peninsula

The Pearl Theater and thematic cultural and artistic park project was officially started on October 5 at Dam Tri lake area, Quang An peninsula, Tay Ho ward, Hanoi . The project has a total estimated investment capital of nearly 13,000 billion VND .

Groundbreaking ceremony of the Pearl Theater and Cultural and Arts Park project at Dam Tri Lake, Quang An Peninsula.
On the morning of October 5, the Pearl Theater and thematic cultural and art park were started at Dam Tri lake area, Quang An peninsula, Tay Ho ward.

The investor of this project is Sun City Company Limited, a member of Sun Group Corporation. This is expected to be a new iconic cultural project of the capital in the future.

The project is invested by Sun City Company Limited, a member of Sun Group.
This project is invested by Sun City Company Limited (a member of Sun Group).

Scale and architectural design

The theater project is built with a floor area of ​​approximately 40,980 m² , not including parking space and technical areas. The project is designed with two main auditoriums with separate functions.

Perspective inside the theater with a total investment of nearly 13,000 billion VND.
Total investment capital is about 13,000 billion VND.

The opera hall has a capacity of 1,797 seats , specially designed for musical and symphony performances. Meanwhile, the multi-purpose auditorium is equipped with a mobile seating system, which can flexibly change the space to organize standing events such as concerts and live music performances with a maximum capacity of 1,430 standing people and 216 seats in the balcony area.

Perspective of the theater's grand auditorium with a floor area of ​​approximately 40,980 m2.
With a floor area of ​​approximately 40,980 m2 (excluding parking and technical areas), the theater project has two large auditoriums including the grand auditorium.
The opera house has a capacity of 1,797 and the multi-purpose hall has a capacity of 1,430 standing.
Opera Hall (capacity 1,797 seats) and multi-purpose auditorium with movable seating system to create space for standing events such as live music performances, concerts… with capacity of 1,430 standing seats and 216 balcony seats.

In addition to the two main performance spaces, the Pearl Theatre also includes many other functional areas such as the Main Hall, rehearsal rooms, museum and Observation Deck, serving a variety of cultural, artistic and sightseeing activities.

Other multi-purpose spaces of the theater include the main hall, rehearsal rooms, and museum.
In addition to the two auditoriums, the Theater also has many other multi-purpose spaces such as the Main Hall, Rehearsal and Practice Room, Museum, Observation Deck...

Construction progress and vision

After nearly two months since the groundbreaking, the project has leveled the Dam Tri area to prepare the ground and started construction of the foundation for the theater. This location was previously part of the natural water surface of the Quang An peninsula.

Project status after about two months of construction, Tri lagoon has been filled and the foundation has been laid.
After about two months of construction, the project has filled Tri lagoon and constructed the foundation.
The site of the theater's construction was formerly the water surface of Tri lagoon.
The theater category was formerly Tri lagoon, located on Quang An peninsula.

According to the design, after the main construction is completed, the area around the theater will be drained again. This is to create a unique architectural effect, giving the feeling that the building is like a pearl floating on the lake.

Perspective of the floating theater after completion.
It is expected that after completion, water will be brought back around the theater, creating the feeling that the theater is floating on the lake.

The Pearl Theatre is expected to be completed and officially put into operation in 2029, promising to become an important cultural, artistic and tourist destination in Hanoi.

Overall perspective of the Pearl Theater expected to be completed in 2029.
The theater is expected to be completed and operational in 2029.

Source: https://baolamdong.vn/nha-hat-13000-ty-o-ho-tay-dien-mao-sau-2-thang-thi-cong-407095.html


Comment (0)

Please leave a comment to share your feelings!

Same tag

Same category

Vietnam is the world's leading Heritage Destination in 2025
Don Den – Thai Nguyen's new 'sky balcony' attracts young cloud hunters
People's Artist Xuan Bac was the "master of ceremonies" for 80 couples getting married together on Hoan Kiem Lake walking street.
Notre Dame Cathedral in Ho Chi Minh City is brightly lit to welcome Christmas 2025

Same author

Heritage

Figure

Enterprise

Brightened after the storm and flood, the Tet chrysanthemum village in Gia Lai hopes there will be no power outages to save the plants.

News

Political System

Destination

Product

Footer Banner Agribank
Footer Banner LPBank
Footer Banner MBBank
Footer Banner VNVC
Footer Banner Agribank
Footer Banner LPBank
Footer Banner MBBank
Footer Banner VNVC
Footer Banner Agribank
Footer Banner LPBank
Footer Banner MBBank
Footer Banner VNVC
Footer Banner Agribank
Footer Banner LPBank
Footer Banner MBBank
Footer Banner VNVC