Vietnam.vn - Nền tảng quảng bá Việt Nam

Approval of construction of the route connecting Noi Bai - Lao Cai expressway with Tuyen Quang - Phu Tho expressway

Việt NamViệt Nam08/06/2024

Tuyen Quang - Phu Tho Expressway through Tuyen Quang province.

The project starts from the connection point of Tuyen Quang - Phu Tho expressway and ends at the existing Ho Chi Minh road, with a total length of 2,736 km, including two main items: Main expressway and service road.

Accordingly, the design speed is 100km/h, investment in expanding 2 lanes on the left side of the existing road, ensuring the completed scale of 4 lanes, roadbed width of 24.75m. The service road is invested with a minimum scale of grade B rural road, roadbed width of 5m, road surface width of 3.5m.

According to the plan, the project will be implemented within 2 years, with main items including: Construction of road surface, drainage system, overpass and other auxiliary works. In particular, the project also focuses on environmental protection, using advanced construction technologies and environmentally friendly materials.


Source

Comment (0)

No data
No data

Same tag

Same category

Spend millions to learn flower arrangement, find bonding experiences during Mid-Autumn Festival
There is a hill of purple Sim flowers in the sky of Son La
Lost in cloud hunting in Ta Xua
The beauty of Ha Long Bay has been recognized as a heritage site by UNESCO three times.

Same author

Heritage

;

Figure

;

Enterprise

;

No videos available

News

;

Political System

;

Destination

;

Product

;