
Along with that, cracks have appeared on the slope, some pine trees on the slope are at risk of falling, posing a potential danger to vehicles traveling on the route. Lam Dong Department of Construction is coordinating with local authorities and related units to clear the landslide and cut down trees at risk of falling, to ensure safety for people and vehicles participating in traffic.
The Department of Construction announced the organization of traffic diversion into the center of Da Lat in 3 directions: the first direction through Mimosa Pass; the second direction through Sacom - Tuyen Lam Pass; the third direction through Ta Nung Pass. The diversion time starts from the afternoon of December 4 until further notice.
Source: https://quangngaitv.vn/lam-dong-lai-dong-duong-deo-prenn-do-sat-lo-6511306.html










Comment (0)