Vietnam.vn - Nền tảng quảng bá Việt Nam

Bustling construction of the 'heart' of Long Thanh Airport

(DN)- The passenger terminal project is the most important item, considered the "heart" of Long Thanh International Airport phase 1.

Báo Đồng NaiBáo Đồng Nai08/07/2025

This is also the category that plays the role of the main progress gantt line of the entire project.

The Long Thanh Airport passenger terminal project includes a central terminal and 3 wings, designed with separate departure and arrival directions. The project includes 1 ground floor and 3 upper floors, the roof height is over 45m, the total floor area is about 376 thousand m2 . Photo: Provided by AVC
According to Vietnam Airports Corporation (ACV), the contractor consortium is currently arranging nearly 4,500 personnel and more than 1,000 machines to implement the construction package.
According to the Vietnam Airports Corporation (ACV), the contractor consortium is currently arranging nearly 4,500 personnel and more than 1,000 machines to implement the package. Photo: Provided by AVC
In early April 2025, the work of raising the roof steel structure (Central location) reached its completion level. The central steel roof of Long Thanh Airport's passenger terminal weighs more than 5,300 tons.
In early April 2025, the work of raising the roof steel structure (Central location) reached its completion level. The central steel roof of Long Thanh Airport's passenger terminal weighs more than 5,300 tons.
By the end of April 2025, the joint venture contractor had completed 100% of the construction of steel structure column head welding for the roof of Long Thanh Airport's passenger terminal.
By the end of April 2025, the joint venture contractor had completed 100% of the construction of welding the column heads of the steel structure roof of Long Thanh Airport's passenger terminal. Photo: Provided by AVC
According to ACV, to ensure watertightness before the rainy season, the entire roof of Long Thanh Airport's passenger terminal will be completed with two layers of roofing (layer 1 - decking and skylight) by mid-July 2025. According to the design, the roof of Long Thanh Airport's passenger terminal will have five layers.
According to ACV, to ensure watertightness before the rainy season, the entire roof of Long Thanh Airport's passenger terminal will be completed with two layers of roofing, including layer 1-decking and skylight, by mid-July 2025. According to the design, the roof of Long Thanh Airport's passenger terminal will have five layers. Photo: Provided by AVC
Along with the construction work, the joint venture contractor is also implementing the construction of the refrigeration, water, and air conditioning systems (MEP work). The construction is being carried out on each floor in a rolling manner, meeting the required schedule.
Along with the construction work, the joint venture contractor is also implementing the construction of the mechanical, electrical, water and air conditioning systems (MEP work). The construction is being carried out on each floor in a rolling manner, meeting the required progress. Photo: Provided by AVC
According to the Prime Minister's request, Long Thanh Airport's passenger terminal must be basically completed by the end of 2025 and completed and put into operation in the first half of 2026, in sync with all other items of the project.
According to the Prime Minister 's request, the Long Thanh Airport passenger terminal must be basically completed by the end of 2025 and completed and put into operation in the first half of 2026, in sync with all other items of the project. Photo: Provided by AVC

Pham Tung (performed)

Source: https://baodongnai.com.vn/kinh-te/202507/nhon-nhip-thi-cong-trai-tim-san-bay-long-thanh-2820826/


Comment (0)

Please leave a comment to share your feelings!

Same tag

Same category

Hanoi girls "dress up" beautifully for Christmas season
Brightened after the storm and flood, the Tet chrysanthemum village in Gia Lai hopes there will be no power outages to save the plants.
The capital of yellow apricot in the Central region suffered heavy losses after double natural disasters
Hanoi coffee shop causes a fever with its European-like Christmas scene

Same author

Heritage

Figure

Enterprise

Beautiful sunrise over the seas of Vietnam

News

Political System

Destination

Product