Vietnam.vn - Nền tảng quảng bá Việt Nam

Latest regulations on land division and subdivision area in Nam Dinh

Báo Dân tríBáo Dân trí20/09/2024


The People's Committee of Nam Dinh province has just issued Decision No. 35/2024 regulating the conditions and minimum area for land division and consolidation in the locality. This regulation will take effect from October 1.

Regarding the demarcation of areas to regulate the minimum area allowed for land division in the province, area I includes land locations in wards of Nam Dinh city and existing towns.

Zone II includes residential land plots located along national, provincial, and district highways; and residential land plots located along commune-level main roads. In addition, it includes residential land plots in specific areas of Nam Dinh City, Truc Ninh District, Yen Yen District, Xuan Truong District, Giao Thuy District, and Hai Hau District.

Zone III comprises land plots located within the remaining zones.

Quy định mới nhất về diện tích tách thửa, phân lô đất tại Nam Định - 1

An urban area in Nam Dinh province (Photo: Duong Tam).

In area I, with the land plot being a component part of a street or alley with a road width of over 2.5m, the residential land plot after being divided must have a minimum area of ​​30m2, a minimum frontage width of 4m, and a minimum depth compared to the construction boundary of 5m.

If the alley has a road width of less than or equal to 2.5m, it must have a minimum area of ​​45m2, a minimum frontage width of 4m, and a minimum depth compared to the construction boundary of 7m.

In areas II and III, the residential land plots after division have a minimum area of ​​50m2 and 80m2 respectively, with a minimum frontage width of 4m and a minimum depth compared to the construction boundary of 7m.

For commercial and service land, after subdivision, the minimum area must be 1,000m2, the minimum frontage width must be 15m, and the minimum depth compared to the construction boundary must be 20m.

For non- agricultural production land, the minimum area is 3,000m2, the minimum frontage width is 20m, the minimum depth from the construction boundary is 25m.

Regarding transitional provisions, for land parcels currently in use or subdivided land parcels with a residential land area smaller than the minimum residential land area, which existed before June 27, 2013 but meet the conditions for granting a land use right certificate, the current land user will be granted a certificate.



Source: https://dantri.com.vn/bat-dong-san/quy-dinh-moi-nhat-ve-dien-tich-tach-thua-phan-lo-dat-tai-nam-dinh-20240920005711715.htm

Comment (0)

Please leave a comment to share your feelings!

Same tag

Same category

Christmas entertainment spot causing a stir among young people in Ho Chi Minh City with a 7m pine tree
What's in the 100m alley that's causing a stir at Christmas?
Overwhelmed by the super wedding held for 7 days and nights in Phu Quoc
Ancient Costume Parade: A Hundred Flowers Joy

Same author

Heritage

Figure

Enterprise

Don Den – Thai Nguyen's new 'sky balcony' attracts young cloud hunters

News

Political System

Destination

Product

Footer Banner Agribank
Footer Banner LPBank
Footer Banner MBBank
Footer Banner VNVC
Footer Banner Agribank
Footer Banner LPBank
Footer Banner MBBank
Footer Banner VNVC
Footer Banner Agribank
Footer Banner LPBank
Footer Banner MBBank
Footer Banner VNVC
Footer Banner Agribank
Footer Banner LPBank
Footer Banner MBBank
Footer Banner VNVC