
By the afternoon of the same day, the entire city of Hue had more than 15,000 houses flooded with a depth of 0.3 - 0.7m. Some localities were heavily affected such as the communes and wards of Quang Dien, Phong Dinh, Hoa Chau, Thanh Thuy, Phu Ho... The Hue City Hydrometeorological Station forecast that from November 6 to 8, the city would have moderate rain, heavy rain, and very heavy rain in some places; the total rainfall for the entire period was commonly 150 - 300mm, with some places over 500mm.
On November 4, forces including the army, police, mass organizations and people of Hue city urgently overcame the consequences of flooding. Hue Urban Environment and Construction Joint Stock Company increased forces and means to clean up the environment; in which, focusing on collecting large amounts of waste swept away by floods, clearing mud on the roads. Hue City Green Parks Center increased forces and means to inspect and clean up the environment in the park system, and reinforce the green tree system. Soldiers, police and teachers simultaneously cleaned up schools in the countries that had withdrawn to welcome students back to school soon.
Hue City Department of Construction mobilizes maximum forces, means and materials to urgently overcome and repair damaged landslides to ensure smooth and safe traffic as soon as possible. Authorities at all levels and organizations continue to visit and encourage families affected by floods; especially policy households, poor households, single-parent households, and those in difficulty; provide timely support with food, drinking water, medicine and essential necessities for people in damaged areas.
Source: https://baotintuc.vn/xa-hoi/hue-con-tren-15000-ngoi-nha-bi-ngap-20251104200054296.htm






Comment (0)