Vietnam.vn - Nền tảng quảng bá Việt Nam

The competent authority decides on traffic flow.

Việt NamViệt Nam25/11/2024


2(2).jpg
Actual inspection at Dak Mi 1 bridge this afternoon. Photo: NB

Accordingly, passenger vans with 16 seats or less and vehicles weighing 5 tons or less, along with motorbikes, rudimentary vehicles, and pedestrians are allowed to travel through Dak Mi 1 bridge. The remaining vehicles travel according to the following instructions: From Phuoc Son to National Highway 1 and vice versa, follow Ho Chi Minh Road ↔ National Highway 14B (Thanh My town, Nam Giang) ↔ National Highway 1; from National Highway 1 to Phuoc Son and vice versa at km972+200 of National Highway 1, follow National Highway 14E to km58+530/National Highway 14E ↔ go to Truong Son Dong Road (about 48km) ↔ Ho Chi Minh Road.

The Department of Transport requested Project Management Board 4 (Vietnam Road Administration) to install traffic flow control signs at intersections between National Highway 14E and Da Nang - Quang Ngai Expressway, Ho Chi Minh Road and DT611 route. Quang Nam Transport Construction Joint Stock Company installed traffic flow control signs at intersections between National Highway 14E and National Highway 1, DT614 route and Truong Son Dong Road.

The Department of Transport has also requested Project Management Board 4 to urgently repair the damaged Dak Mi 1 bridge to ensure smooth and safe traffic on National Highway 14E.

1(2).jpg
Large rocks collapsed from the slope, damaging the bridge. Photo: NB

Previously, on the morning of November 25, Project Management Board 4 sent a quick report to the People's Committee of Quang Nam province, the Vietnam Road Administration and the Quang Nam Department of Transport about the deviation of the Dak Mi 1 bridge deck due to the impact of local heavy rains. Project Management Board 4 (the unit assigned to manage the project to renovate and upgrade National Highway 14E) said that due to the impact of local heavy rains in the past few days, the positive slope at the location of km85+400 (behind the M2 pier of Dak Mi 1 bridge) collapsed, dragging rocks and soil with it. The huge orphaned rock rolled down, causing the bridge deck system of span 3 of Dak Mi 1 bridge to deviate by about 47cm.



Source: https://baoquangnam.vn/cau-dak-mi-1-tren-quoc-lo-14e-bi-su-co-nganh-chuc-nang-quyet-dinh-phan-luong-giao-thong-3144803.html

Comment (0)

No data
No data

Same tag

Same category

Discover the only village in Vietnam in the top 50 most beautiful villages in the world
Why are red flag lanterns with yellow stars popular this year?
Vietnam wins Intervision 2025 music competition
Mu Cang Chai traffic jam until evening, tourists flock to hunt for ripe rice season

Same author

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product