
The report also pointed out several shortcomings and limitations, including a shortage of suitable clay for dike construction in some coastal areas; price fluctuations of some imported materials (high-quality geotextiles, HDPE membranes) affecting progress; and a lack of full compliance with material testing procedures for some types of materials used.
Regarding the utilization of dredged material, Ca Mau province currently lacks comprehensive research to develop a plan for using dredged material from river mouths and seaports as landfill material that meets technical standards and regulations. For the time being, the province is implementing two forms of utilization: using dredged material for maintenance and reinforcement of riverbanks, preventing saltwater intrusion, storing freshwater, preventing flooding, and creating foundations for transportation infrastructure; and simultaneously socializing some dredging projects combined with the recovery of dredged material to provide landfill material throughout the province.
Source: https://sonnmt.camau.gov.vn/tin-hoat-dong/so-nong-nghiep-va-moi-truong-bao-cao-ket-qua-thuc-hien-de-an-phat-trien-vat-lieu-xay-dung-cho-co-292275






Comment (0)