HEAVY RAIN FORECAST IN THE AREA FROM HA TINH TO DA NANG CITY AND THE EASTERN PART OF QUANG NGAI PROVINCE
Rainfall in the past 24 hours: Last night and this morning (October 29), in Hue City, Da Nang City and the East of Quang Ngai Province, there was moderate rain, heavy rain, and in some places very heavy rain.
Rainfall from 7:00 p.m. on October 28 to 8:00 a.m. on October 29 was locally over 250mm in some places such as: Bach Ma Peak station (Hue City) 257.6mm, Tra Van station (Da Nang City) 289.8mm, Tra Nham station ( Quang Ngai ) 370.4mm,...
Forecast of heavy rain in the next 24-48 hours: From the morning of October 29 to the night of October 30, in the area from Hue City to Da Nang City and the East of Quang Ngai Province, there will be heavy to very heavy rain with common rainfall of 100-200mm, locally over 400mm; the area from Ha Tinh to Quang Tri will have moderate to heavy rain with common rainfall of 70-150mm, locally over 300mm (from October 30, heavy rain in the area from Hue City to Quang Ngai is likely to gradually decrease).
Warning of risk of heavy rain (>150mm/3h).
In addition, on the day and night of October 29, in the Central Highlands, the South and the eastern provinces from Gia Lai to Lam Dong, there will be rain, moderate rain and thunderstorms with rainfall of 20-40mm, locally heavy to very heavy rain of over 100mm. During thunderstorms, there is a possibility of tornadoes, lightning, hail and strong gusts of wind.
Warning of risk of heavy rain (>80mm/3h).
From October 31, heavy rain in the above areas tends to decrease.
Warning level of natural disaster risk due to heavy rain, tornado, lightning, hail: level 1, level 2 for Hue City and Da Nang City.
Forecast of the impact of heavy rain: Heavy rain is likely to cause flooding in low-lying areas, urban and industrial areas; flash floods on small rivers and streams, landslides on steep slopes (real-time warning information on areas at risk of flash floods and landslides is provided online on the website of the Department of Hydrometeorology at: https://luquetsatlo.nchmf.gov.vn and in a separate bulletin warning of flash floods and landslides). During thunderstorms, there is a possibility of tornadoes, lightning, hail and strong gusts of wind.
EMERGENCY FLOOD NEWS (EXTREMELY LARGE FLOOD) ON RIVERS IN HUE CITY AND DA NANG CITY
Current status: Currently, the flood on the Huong River (Hue City) is receding, on the Bo River (Hue City) is changing slowly; on the Vu Gia - Thu Bon River (Da Nang City) is changing slowly at a high level; the flood on the Tra Khuc River (Quang Ngai) is rising rapidly, on the Dak Bla River (Quang Ngai) is rising. The water level at 08:00 on October 29, 2025 on some rivers is as follows:
- On Bo River (Hue city) at Phu Oc station is 4.45m, below BĐ30.05m.
- On Huong River (Hue city) at Kim Long station is 3.61m, on BĐ3 0.11m.
- On Vu Gia river (Da Nang city) at Ai Nghia station is 9.92m, on BD3 0.92m.
- On Thu Bon River (Da Nang city) at Cau Lau station (at 7:00 a.m. on October 29, 2025) is 5.20m, on BĐ3 1.20m.
- On Tra Khuc River at Tra Khuc station is 6.95m, on BĐ3 0.45m.
Forecast: In the next 6 hours, flood on Thu Bon River (Da Nang city) and Tra Khuc River (Quang Ngai) will continue to rise and be above level 3.
In the next 12 hours, flood on Thu Bon River (Da Nang city) will continue to rise and be above level 3; flood on Tra Khuc River at Tra Khuc station will fall and be above level 3; flood on Bo River (Hue city) at Phu Oc station will fluctuate at its peak, on Huong River at Kim Long station will fall and be below level 3; flood on Vu Gia River (Da Nang city) at Ai Nghia station will rise slowly and be above level 3.
In the next 24 hours, floods on Vu Gia - Thu Bon River (Da Nang City), Tra Khuc River (Quang Ngai) will decrease and be at level BĐ3 to above BĐ3; floods on rivers in Hue City will decrease and be below level BĐ3;
Warning: In the next 24 hours, flood on Dak Bla River (Quang Ngai) will continue to rise and may reach level BĐ1-BĐ2.
The situation of deep and widespread flooding in Hue city and Da Nang city will continue in the next few days, with the risk of widespread flooding in Quang Ngai province, especially in riverside and low-lying areas; there is a high risk of flash floods on rivers and streams and landslides on slopes in provinces/cities from Hue to Quang Ngai (real-time warning information on the risk of flash floods and landslides is provided online on the website of the Department of Hydrometeorology at: https://luquetsatlo.nchmf.gov.vn and in the flash flood and landslide warning bulletin).
Flood disaster risk warning level: Level 3.
Flood impact warning: Floods on rivers and inundation in low-lying areas affect activities such as water transport, aquaculture, agricultural production, people's lives and socio-economic activities.
Note: Forecast and warning information is calculated based on the expected operating level of upstream reservoirs. Hydrometeorological agencies will update the bulletins when there are changes in the discharge flow of reservoirs.
FLASH FLOOD, LANDSLIDES, SUBSTITUTION WARNING
Rain situation: In the past 24 hours (from 10:00 on October 28 to 10:00 on October 29), the provinces/cities from Quang Tri to Quang Ngai had heavy rain, especially in some places with very heavy rain such as: La To Hydropower Dam 261.6mm (Quang Tri); Thuong Nhat Hydropower Dam 252.8mm (Hue City); Tra Giap 490.8mm (Da Nang City); Tra Thanh 574.6mm (Quang Ngai);...
In the past 8 hours (from 2am to 10am on October 29), Gia Lai province has had moderate to heavy rain such as: Bong Son 98.4mm, An Tuong 97.6mm,...
Soil moisture models show that some areas in the above provinces are close to saturation (over 85%) or have reached saturation.
Rain warning for the next period: In the next 3-6 hours, the above provinces/cities will continue to have rain with common accumulated rainfall as follows: Hue City, Da Nang City and Quang Ngai from 80-130mm, some places over 200mm; Quang Tri and Gia Lai from 30-60mm, some places over 80mm.
Risk warning: In the next 6 hours, there is a risk of flash floods on small rivers and streams, and landslides on steep slopes in many communes/wards in the above provinces and cities.
Warning level of natural disaster risk due to flash floods, landslides, land subsidence due to heavy rain or water flow: Level 1; Quang Ngai: Level 2; Hue City and Da Nang City: Level 3.
Warning of the impact of flash floods, landslides, and land subsidence due to heavy rain or water flow: Flash floods and landslides can have very negative impacts on the environment, threaten people's lives; cause local traffic congestion, affect the movement of vehicles; destroy civil and economic works, causing damage to production and socio-economic activities.
It is recommended that local authorities pay attention to reviewing bottlenecks and key locations in the area to have prevention and response measures.
List of areas at risk of flash floods and landslides in the next 6 hours
Quang Tri: Dakrong, Ta Rut; Huong Phung, La Lay; Ba Long, Ben Quan, Cam Lo, Con Tien, Huong Hiep, Kim Ngan, Le Ninh, Nam Hai Lang, Dong Son Ward, Quang Ninh, Truong Ninh, Truong Phu, Truong Son
Hue: A Luoi 1, A Luoi 4, A Luoi 5, Binh Dien, Chan May - Lang Co, Hung Loc, Khe Tre, Loc An, Long Quang, Nam Dong, Phong Dien Ward, Phu Bai Ward, Phu Loc, Vinh Loc; A Luoi 2, A Luoi 3, Huong Tra Ward, Kim Long Ward, Phong Thai Ward; Huong An Ward, Kim Tra Ward
Da Nang: Avuong, Ba Na, Ben Giang, Ben Hien, Chien Dan, Dac Pring, Dong Duong, Dong Giang, Duc Phu, Hiep Duc, Hoa Tien, Hoa Vang, Kham Duc, La Dee, La Ee, Lanh Ngoc, Nam Giang, Nam Tra My, Nong Son, Nui Thanh, An Khe Ward, Hai Van Ward, Son Tra Ward, Phu Ninh, Phuoc Chanh, Phuoc Hiep, Phuoc Nang, Phuoc Thanh, Phuoc Tra, Que Phuoc, Que Son, Que Son Trung, Son Cam Ha, Song Kon, Song Vang, Tam Anh, Tam My, Tam Xuan, Tay Giang, Tay Ho, Thang Phu, Thanh Binh, Thanh My, Thuong Duc, Tien Phuoc, Tra Giap, Tra Leng, Tra Lien, Tra My, Tra Tan, Tra Tap, Tra Van, Viet An; Dai Loc, Duy Xuyen, Ha Nha, Hung Son, Hoa Khanh Ward, Lien Chieu Ward, Phu Thuan, Thu Bon, Tra Doc; Tra Linh, Phu Thuan, Hung Son
Quang Ngai: Ba Dinh, Ba Dong, Ba Gia, Ba To, Ba To, Ba Vi, Ba Vinh, Ba Xa, Binh Chuong, Binh Minh, Ca Dam, Dak Pek, Dak Plo, Dinh Cuong, Dong Tra Bong, Kon Plong, Mang But, Mang Den, Mang Ri, Minh Long, Mo Duc, Nghia Giang, Ngoc Linh, Phuoc Giang, Son Ha, Son Ky, Son Linh, Son Mai, Son Tay, Son Tay Ha, Son Tay Thuong, Son Thuy, Son Tinh, Tay Tra, Tay Tra Bong, Thanh Bong, Thien Tin, Tra Bong, Tra Giang, Truong Giang, Ve Giang, Xop; Dak Mon, Dak Sao, Dang Thuy Tram, Khanh Cuong, Kon Dao, Lan Phong, Nguyen Nghiem, Duc Pho Ward, Tra Cau Ward, Tu Mo Rong; Bo Y, Dak Koi, Dak Rve, Dak To Kan, Duc Nong, Ngok Tu, Sa Huynh Ward, Sa Loong
Gia Lai: An Hao, An Hoa, An Lao, An Toan, An Tuong, An Vinh, Bong Son Ward, Hoai Nhon Bac Ward, Hoai Nhon Dong Ward, Hoai Nhon Tay Ward, Tam Quan Ward; Binh Duong, Binh Khe, Binh Phu, Canh Vinh, Dak Rong, Dak Somei, Hoa Hoi, Hoai An, Hoi Son, KBang, Kim Son, An Nhon Nam Ward, Hoai Nhon Ward, Hoai Nhon Nam Ward, Phu Cat, Phu My, Phu My Bac, Phu My Tay, Van Canh, Van Duc, Vinh Quang, Vinh Thanh, Vinh Thinh, Xuan An

Resolutely respond to heavy rains, floods, flash floods, landslides
Previously, Deputy Prime Minister Tran Hong Ha signed Official Dispatch No. 203/CD-TTg dated October 27, 2025 of the Prime Minister directing to focus on emergency response and overcoming the consequences of heavy rains and floods in the Central region.
Accordingly, in order to proactively prevent, avoid, respond, ensure the safety of people's lives, reduce damage to people and property, the Prime Minister requests the Chairmen of the People's Committees of the provinces and cities: Quang Tri, Hue, Da Nang, Quang Ngai and the Ministries: National Defense, Public Security, Agriculture and Rural Development, Construction, Industry and Trade and relevant ministries and branches to focus on directing resolutely and effectively the work of preventing, avoiding, and responding to heavy rains, floods, flash floods, landslides according to the direction in Official Dispatch No. 202/CD-TTg dated October 22 of the Prime Minister, focusing on the following specific tasks:
1. The Chairmen of the People's Committees of the provinces and cities of Quang Tri, Hue, Da Nang, and Quang Ngai continue to direct:
a) Organize close monitoring, complete updates, and timely information on the situation and forecast of floods and rains so that people can proactively respond, not allowing people to be unaware of information about natural disasters; strengthen dissemination and guidance on response skills for each natural disaster situation, especially landslides, flash floods, and inundations.
b) Review and detect areas at risk of flash floods, landslides, and deep flooding to promptly warn people and proactively evacuate people to safety.
Deploy forces and means to control, guide, and support traffic, and arrange rescue forces, especially in areas at risk of being cut off or isolated due to landslides and floods, to be ready to respond when bad situations occur.
c) Deploy dike and dam protection work according to the alarm level; closely monitor and proactively coordinate with the competent agencies of the Ministry of Agriculture and Environment and the Ministry of Industry and Trade to direct the operation of irrigation and hydroelectric dams in the area to ensure scientific and safe operation of the works and contribute to flood reduction and flood control for downstream areas.
d) Based on the specific situation in the locality, decide to let students stay home from school and implement measures to ensure people's safety.
d) Focus on directing, promptly organizing visits and encouragement; timely support with food, drinking water, medicine and essential necessities for people in damaged areas. Absolutely ensure that people do not go hungry, cold, lack clean water, or do not receive medical support when sick.
e) Immediately after the flood recedes, it is necessary to urgently mobilize forces to carry out environmental sanitation, disinfection, and disease prevention and control.
At the same time, support people to repair their houses, quickly restore production (especially agricultural production), and soon stabilize their lives.
Top priority must be given to ensuring safety conditions for students returning to school and providing health care and medical treatment for the people.
g) Direct the organization to review, compile statistics, and specifically assess damage caused by floods; synthesize, report, and propose support solutions (in cases beyond the capacity of the locality).
Proactively and urgently coordinate with relevant ministries and branches to review and carefully assess the impact of socio-economic infrastructure works on flood drainage capacity in the area to have timely and appropriate solutions and adjustments.
2. Minister of Agriculture and Environment
a) Directing hydrometeorological forecasting agencies to closely monitor and refer to international forecast information to forecast and provide the earliest, most complete and accurate information on the developments and impacts of floods, flash flood and landslide risks so that authorities and people know and proactively deploy appropriate, timely and effective response measures.
b) Proactively direct the work of ensuring safety for fishing vessels at sea and along the coast, protecting dikes, irrigation dams, and agricultural production; coordinate with the industry and trade sector and localities to direct the safe and effective operation of the inter-reservoir system, absolutely not allowing unsafe dams and reservoirs to occur.
c) Closely monitor the situation, direct and urge sectors and localities to deploy response work appropriate to the actual situation, promptly report and propose to the National Civil Defense Steering Committee and the Prime Minister to direct issues beyond their authority.
3. The Minister of Construction directs the immediate implementation of response solutions, protection of works and traffic infrastructure; ensuring traffic safety, construction activities, especially safety for people and vehicles at construction sites of expressways during the period affected by floods; concentrating maximum forces, vehicles and materials to promptly overcome and repair landslides and damaged areas, ensuring smooth and safe traffic in the shortest time, especially on main traffic axes and arterial routes.
4. The Minister of Industry and Trade directs the assurance of safety of hydroelectric dams, power systems and industrial production, and limits damage caused by floods.
5. The Ministries of National Defense and Public Security proactively direct units located in the area to review plans, arrange forces and means to be ready to support localities in implementing evacuation and relocation of residents, responding to floods and storms, and conducting search and rescue when requested.
6. The Ministries of Education and Training, Health, Science and Technology, Culture, Sports and Tourism, according to their functions, tasks and authority, proactively coordinate with localities to direct competent agencies to deploy flood prevention, response and mitigation work, limiting damage to the sectors and fields under their management.
7. The Office of the National Civil Defense Steering Committee closely monitors the situation and is ready to coordinate and mobilize forces and means to support localities in responding to floods and storms according to assigned functions and tasks.
8. Vietnam Television, Voice of Vietnam, and Vietnam News Agency promptly inform about natural disaster situations and response instructions from competent authorities, and increase dissemination and guidance on measures and skills to respond to floods, landslides, and flash floods for people.
9. The Government Office monitors and urges ministries and localities to seriously implement this Official Dispatch; promptly reports to the Prime Minister and Deputy Prime Minister in charge on urgent and arising issues.
FULL TEXT: Official dispatch No. 203/CD-TTg directing to focus on emergency response and overcoming consequences of heavy rain and floods in the Central region



The Ministry of National Defense requested to focus on emergency response and overcoming flood consequences in the Central region.
The Ministry of National Defense has just issued urgent dispatch No. 6840/CD-BQP dated October 27, 2025 on focusing on emergency response and overcoming the consequences of heavy rains and floods in the Central region.
Telegram sent to: General Staff, General Department of Politics of the Vietnam People's Army; General Departments: Logistics - Engineering, Defense Industry, General Department II; Military Regions: 4, 5; Army Corps 34; Service Branches: Air Defense - Air Force, Navy; Border Guard, Vietnam Coast Guard; Artillery - Missile Command; Service Branches: Armored, Special Forces, Engineering, Chemical, Communications; Service Corps: 12, 15, 16, 18; Military Industry - Telecommunications Group (Viettel).
Implementing the Prime Minister's Official Dispatch No. 203/CD-TTg dated October 27, 2025 on focusing on emergency response and overcoming the consequences of heavy rain and floods in the Central region, to minimize damage to life and property of the State and people, the Ministry of National Defense requests military agencies and units to continue strictly implementing Official Dispatch No. 6702/CD-BQP dated October 22, 2025 on focusing on prevention, avoidance, and response to rain, floods, flash floods, landslides in the Central Central region; strictly maintain on-duty regime, proactively monitor and grasp the situation of rain and floods; mobilize the highest forces and means to promptly respond to situations that occur, ensuring the safety of barracks, warehouses and military bases.
In addition, agencies and units must inspect and promptly move units out of areas at high risk of landslides and unsafety; inspect and review plans and response options for key areas of natural disasters, areas at risk of flash floods, landslides, dykes, embankments, lakes, dams, flooding, and isolation; proactively help authorities and people evacuate households in dangerous areas to safe places; ensure the safety of key works, unfinished works, industrial parks, urban areas, residential areas and production activities, low-lying areas to prevent unfortunate human losses, and ensure the safety of forces performing tasks.
The Ministry of National Defense requests the General Departments: Logistics - Engineering, Defense Industry, General Department II, according to their functions and tasks, to strengthen direction, urge, and inspect subordinate units to do a good job of responding to and overcoming consequences of rain, floods, flash floods, landslides; ensure safety of warehouses, factories, weapons and equipment; ensure good logistics and technology to serve natural disaster response work; proactively coordinate, provide and promptly transport rescue supplies and equipment to help localities respond to and overcome consequences.
The Ministry of National Defense assigned Military Region 4 and Military Region 5 to coordinate with local Party committees and authorities to organize delegations to inspect, urge, and direct the implementation of response work to floods, inundation, flash floods, landslides in provinces and cities; proactively organize forces and means to join localities in overcoming the consequences of floods in the area; organize to reserve forces, means, food, and communications at key points at risk of being isolated to promptly and effectively handle situations without being passive or surprised.
The Vietnam Navy and Coast Guard directed their subordinate agencies and units to deploy safety measures; and prepare forces and means for search and rescue when requested by localities.
The Air Defense - Air Force and the 18th Army Corps are ready with forces and means to conduct search and rescue flights; transport food, provisions, and necessities to isolated areas upon order from the Ministry.
The 34th Corps, the Artillery - Missile Command and the military branches and corps review and supplement plans and options suitable to the actual situation, coordinate with local authorities where they are stationed and where they carry out missions, and prepare forces and means to participate in rescue when requested by the locality.
The Ministry of National Defense noted that the Information and Communications Corps and the Military Industry-Telecoms Group coordinate with relevant agencies and units to ensure information, communication, transmission lines and necessary conditions to serve the Government, the Prime Minister and the Ministry of National Defense in directing and operating civil defense.
The units shall implement and report to the Ministry of National Defense (through the Ministry's Command Headquarters and the Department of Rescue and Relief, General Staff) for the Ministry to monitor and direct.
The General Staff requested agencies and units to proactively respond to exceptionally large floods on rivers in Hue and emergency floods on rivers in Da Nang.
On October 27, 2025, Lieutenant General Le Quang Dao - Deputy Chief of the General Staff of the Vietnam People's Army signed telegram No. 6165/CD-TM to: General Department of Politics; General Department: Logistics - Engineering, Defense Industry, General Department II; Military Regions: 4, 5; Corps 12, 34; Services: Navy, Air Defense - Air Force; Border Guard, Vietnam Coast Guard; Artillery - Missile Command; Services: Armored, Special Forces, Engineering, Chemical, Communications; Corps: 11, 12, 15, 16, 18; Military Industry - Telecommunications Group, with the content:
Pursuant to Official Dispatch No. 21/CD-BCĐ-BNNMT dated October 27, 2025 of the National Civil Defense Steering Committee on proactively responding to exceptionally large floods on rivers in Hue city and emergency floods on rivers in Da Nang city; to proactively respond to exceptionally large floods to ensure safety of life and limit damage to people and property, the General Staff requests agencies and units to implement the following contents:
1. Continue to thoroughly grasp and strictly implement the Prime Minister's and General Staff's dispatches on focusing on responding to heavy rain, the risk of flash floods, localized flooding, and landslides, and avoid being caught off guard.
2. Maintain strict on-call duty at all levels, grasp weather, meteorological and hydrological situations; continue to review response plans and solutions, promptly and effectively handle incidents and natural disasters. Mobilize forces and means to participate in rescue when required. Ensure the safety of people and means for forces on duty.
3. Commands of Military Regions 4 and 5: Direct subordinate units and Military Commands of provinces and cities according to their functions and tasks to advise local authorities to direct departments, branches, sectors, and forces stationed in the area to inspect key areas with floods, flash floods, landslides, urgently mobilize forces, means, food, and communications in areas at risk of being cut off and isolated due to landslides and floods, promptly respond and overcome the consequences of natural disasters; propagate, guide, and advise people to limit travel and activities during floods; control people and vehicles traveling on roads at risk of being unsafe during floods; arrange forces to support traffic through culverts and deeply flooded roads.
4. The Air Defense - Air Force, Corps 18 is ready with forces and aircraft to search and rescue, transport goods and necessities when requested by the Ministry.
5. Signal Corps, Military Industry - Telecommunications Group: Ensure uninterrupted communication to serve the direction and operation of disaster response work, especially in isolated areas.
6. The Army Corps, Service Branches, and Army Corps direct their subordinate units to mobilize forces and means to help localities where they are stationed overcome the consequences of natural disasters when requested.
7. Request the General Department of Politics to direct the Army Radio and Television Center, the People's Army Newspaper and units to do a good job of propagating and reporting on the activities of the army to help people overcome the consequences of floods and search and rescue; promptly commend and reward groups and individuals with outstanding achievements in responding to and overcoming the consequences of natural disasters.
The units shall implement and report to the General Staff (through the Ministry's Command and the Department of Rescue and Search and Rescue first) for the Ministry to monitor and direct.
Deploying response to heavy rain, floods, flash floods, and landslides in the Central region
On October 27, 2025, Major General Pham Hai Chau - Deputy Director of the Department of Rescue and Relief/BTTM signed telegram No. 3686/CD-CHCN on the deployment of response to heavy rains, floods, flash floods, and landslides in the Central region and sent to: Military Region 4, 5; Air Defense - Air Force, Border Guard, Coast Guard, Artillery - Missile; Special Forces, Armored Corps, Engineers, Communications, Chemical Corps; Corps 12, 34; Corps 11, 12, 15, 16, 18, with the following content:
To promptly respond to heavy rains, floods, flash floods, and landslides in the Central region. The Department of Rescue and Relief/General Staff requests units to:
1. Continue to thoroughly grasp and strictly implement the General Staff's dispatches on focusing on responding to heavy rain, the risk of flash floods, localized flooding, and landslides.
2. Maintain strict on-call duty at all levels, grasp weather, meteorological and hydrological situations; continue to review response plans and solutions, promptly and effectively handle incidents and natural disasters. Mobilize forces and means to participate in rescue when required. Ensure the safety of people and means for forces on duty.
3. Military Regions 4 and 5: Direct subordinate units and Military Commands of provinces and cities according to their functions and tasks to advise local Party committees and authorities to direct departments, branches, sectors, and forces stationed in the area to inspect key areas with floods, flash floods, landslides, urgently mobilize forces, means, food, and communications in areas at risk of being cut off and isolated due to landslides and floods, promptly respond and overcome the consequences of natural disasters.
4. Air Defense - Air Force Service, Army Corps 18: Check and review plans, organize forces and vehicles to be ready to conduct search and rescue flights and air rescue when ordered by the Ministry.
5. Units shall inspect and review response plans and solutions, ensure the safety of barracks and warehouses; coordinate and cooperate with local authorities to prepare forces and means to participate in responding to and overcoming the consequences of natural disasters when requested.
Units are requested to implement and report results to the General Staff (through the Department of Rescue) to help the Ministry monitor and direct.
The Ministry of Public Security directed to focus on emergency response and overcoming the consequences of heavy rain and floods.
On October 27, 2025, the Ministry of Public Security's Civil Defense Command issued Official Dispatch No. 30/CD-BCH to the Public Security of units and localities on focusing on emergency response and overcoming the consequences of heavy rain and floods.
Telegram sent to :
- Heads of units: Department of Internal Security, Department of Economic Security, Department of Cyber Security and High-Tech Crime Prevention and Control, Department of Environmental Crime Prevention and Control, Department of Administrative Police for Social Order, Department of Fire Prevention, Fire Fighting and Rescue, Department of Traffic Police, Department of Police for Management of Prisons, Compulsory Education Facilities, Reformatories, Mobile Police Command, Department of Planning and Finance, Department of Construction and Barracks Management, Department of Equipment and Logistics, Department of Telecommunications and Cryptography, Department of Information Technology, Department of Health, Department of People's Public Security Communications, Mobifone Telecommunications Corporation;
- The Steering Committee for Disaster Prevention and Control of the Public Security of the provinces and cities: Quang Tri, Hue, Da Nang, Quang Ngai, Khanh Hoa, Gia Lai, Dak Lak.
Strictly implementing the Prime Minister's Official Dispatch No. 203/CD-TTg dated October 27, 2025 on focusing on emergency response and overcoming the consequences of heavy rain and floods in the Central region; the Steering Committee for Disaster Prevention and Control/Ministry of Public Security requests the Steering Committee for Disaster Prevention and Control of Public Security units and localities to focus on directing the implementation of the following key tasks:
1. Strictly implement the directives of the Prime Minister, the National Steering Committee for Civil Defense, and the Ministry of Public Security on responding to heavy rains, floods, flash floods, and landslides, focusing on: Official Dispatch No. 202/CD-TTg dated October 22, 2025 of the Prime Minister; Official Dispatch No. 29/CD-BCA-V01 dated October 20, 2025 of the Ministry of Public Security.
Closely monitor the developments of rain, floods, and inundation, especially exceptionally large floods on rivers in Hue city and emergency floods on rivers in Da Nang city to proactively and immediately deploy appropriate response measures and plans in all situations, avoiding being passive or surprised.
2. Police units and localities do a good job of preventing and fighting natural disasters:
(1) Absolutely ensure the safety of life, health and property of the people, forces performing the tasks of natural disaster prevention and control, search and rescue, and the safety of headquarters, detention facilities, documents and working equipment of the People's Public Security force;
(2) Assign specific tasks and assign responsibilities to each leader and officer in charge of the area, ensuring clear people, clear work, clear responsibilities, and not leaving areas vacant in the implementation work.
3. Advise local Party committees and authorities and coordinate with forces to immediately deploy measures to respond to rain and floods:
(1) Urgently evacuate people in dangerous areas to safety;
(2) Deploy response plans to prolonged heavy rains and floods causing inundation, separation, and isolation according to the "4 on-site" motto;
(3) Ensure the safety of dikes, dams, hydroelectric power plants, and works with key and important projects related to national security and people's safety when releasing floods to downstream areas;
(4) Support food, drinking water, medicine and other essential necessities for people in damaged areas.
4. Arrangement of forces and means:
(1) Guide, direct traffic, ensure traffic safety, strictly control people and vehicles through culverts, spillways, deep flooded areas, fast-flowing water, landslide areas, and heavy rain;
(2) Organize rescue, relief and support to overcome the consequences of natural disasters. Timely detect and strictly handle acts of taking advantage of natural disasters to violate the law, post inaccurate information on cyberspace, affecting the work of preventing and fighting natural disasters.
5. The functional units of the Ministry (Mobile Police Command, Fire Prevention, Fire Fighting and Rescue Police Department, Traffic Police Department, Police Department for Management of Prisons, Compulsory Education Facilities, Reformatories, Planning and Finance Department, Construction and Barracks Management Department, Equipment and Logistics Department, Health Department) proactively ensure logistics - technology and equipment, rescue vehicles to provide timely support; Mobifone Telecommunications Corporation, Telecommunications and Cryptography Department ensure safety of signal information and communication of the People's Public Security; The People's Public Security Communications Department closely coordinates with the Public Security of units, localities, central and local media agencies to organize routes, articles, news, and activities of the People's Public Security force in preventing and fighting natural disasters, rescuing and supporting the People.
6. Strictly organize the on-duty regime, ensure 24/7 communication; promptly report to the PTDS/BCA Command Board according to regulations (through the Ministry Office, Phone: 0931706789 or 0979087633) for synthesis and reporting.

Proactively respond to especially large floods and emergency floods
Previously, the Head of the National Civil Defense Steering Committee issued Official Dispatch No. 21/CD-BCĐ-BNNMT dated October 27, 2025 on proactively responding to exceptionally large floods on rivers in Hue city and emergency floods on rivers in Da Nang city.
The telegram stated: Currently, floods on the Huong River (Hue City) and Vu Gia-Thu Bon River (Da Nang City) are rising above alert level 3.
It is forecasted that on the afternoon of October 27, floods on rivers in Hue city will continue to rise rapidly, at Phu Oc station it is likely to rise above the historical level by 0.05 - 0.1m (5.24m in 2020); at Kim Long station it will rise above level BĐ3 by 1.10m; on Vu Gia river at Ai Nghia station it will continue to rise and be above level BĐ3; There is a high risk of deep flooding in low-lying areas along rivers and flash floods and landslides in mountainous areas.
To proactively respond to exceptionally large floods and emergency floods, the National Civil Defense Steering Committee recommends that ministries, branches and People's Committees of Hue and Da Nang cities:
Closely monitor developments of especially heavy rains and floods and emergency floods; promptly inform authorities at all levels and people to proactively prevent and avoid them.

Urgently organize the evacuation of people
Urgently organize the evacuation of people in low-lying areas, riverside areas at high risk of flooding, and areas at high risk of landslides to safety.
Especially for Hue city, immediately deploy a response plan to deal with historic floods in 2020 or larger.
Based on the specific situation, proactively decide to let students stay home from school during heavy rain and floods to ensure safety; arrange forces to control, support, and guide traffic in deeply flooded areas, and resolutely not let people pass through if safety is not ensured.
Directing the operation and regulation of hydroelectric and irrigation reservoirs to ensure safety of works and downstream areas.
Handling dike incidents in the first hour
Organize patrols, guard, deploy flood prevention plans, ensure safety according to alarm levels; prepare forces, materials and means to handle dike incidents at the first hour.
Immediately deploy forces, vehicles, supplies, food, and necessities in key areas, especially those at risk of separation and isolation, to promptly respond to and handle incidents according to the "four on-the-spot" motto.
Direct local radio and television stations to increase information on developments of heavy rain, floods, emergency floods, and reservoir discharges to people and authorities at all levels for proactive prevention; specialized agencies coordinate with local television stations and media agencies, especially at the grassroots level, to propagate, disseminate, and guide people to proactively respond to minimize damage.
Be on duty seriously and regularly report to the National Civil Defense Steering Committee (through the Department of Dike Management and Disaster Prevention - Ministry of Agriculture and Environment).


Chairman of Da Nang City People's Committee directed to focus on responding to and overcoming consequences caused by floods, landslides
On October 27, the People's Committee of Da Nang City issued Official Dispatch No. 3261/UBND-PTDS on focusing on responding to and overcoming consequences caused by floods and landslides.
Currently, the water level on the Vu Gia - Thu Bon River is rising rapidly, approaching and exceeding the alarm level 3. The soil moisture model shows that some areas are nearly 95% saturated, with the risk of flash floods on small rivers and streams in mountainous areas; landslides on steep slopes, and land subsidence.
The forecast of rain and flood situation is still very complicated in the coming days. The Chairman of the City People's Committee requested:
Armed forces units, departments, branches, sectors, People's Committees of communes, wards, special zones and related units:
Organize on-duty staff, closely monitor forecasts, warnings of natural disasters, rain and flood situations, promptly inform the people about natural disaster situations to proactively respond; deploy plans to prevent and combat natural disasters; continue to implement and ensure the contents according to the direction of the Chairman of the City People's Committee in Official Dispatch No. 07/CD-UBND dated October 17, 2025 on proactively responding to natural disasters in the next 10 days and weather trends from now until the end of 2025 and Official Dispatch No. 08/CD-UBND dated October 21, 2025 on proactively responding to very heavy rain and storm No. 12.
Report on response work and damage caused by natural disasters to the Da Nang City Civil Defense Command (through: Military Command (Standing Agency), Department of Agriculture and Environment (advisory agency on natural disaster prevention work)) before 6:00 and 15:00 for timely synthesis and reporting to the Standing Committee of the City Party Committee, the City People's Committee and the Central agencies.
Chairmen of People's Committees of communes, wards and special zones continue to maintain and deploy activities to respond to heavy rains, floods, flash floods, landslides... Proactively inspect and review unsafe areas, especially deeply flooded and isolated areas, low-lying areas along rivers and streams, and areas at risk of flash floods and landslides.
Proactively deploy guards, checkpoints, and strictly prohibit people and vehicles from traveling on deeply flooded roads, fast-flowing, stagnant, overflowing roads, on rivers, streams, reservoirs, and areas at high risk of landslides and flash floods.
Continue to maintain and strengthen people's evacuation activities to ensure safety, especially in dangerous areas, ensure food for people in flooded and landslide-affected areas and at evacuation sites, and prevent people from suffering from hunger, cold, rain, etc.
The Department of Construction shall preside over and coordinate with the military and local forces to immediately handle traffic routes that have been damaged by landslides and are impassable. Arrange a system of warning signs and barriers on roads that have been damaged by landslides. Research and propose long-term, appropriate and sustainable solutions.
Assign the Department of Agriculture and Environment to coordinate with the People's Committees of communes, wards and special zones to urgently identify landslides and landslide risks that may affect people's housing. Advise on short-term and long-term solutions, focusing on proposing resettlement projects for natural disaster areas to be included in the medium-term plan for the period 2026-2030.
Assign the Department of Education and Training and the People's Committees of communes and wards to proactively decide to let students stay home from school depending on the actual situation of floods and the characteristics of each locality (especially pay attention to localities at risk of landslides).
The Department of Finance shall preside over, advise, and propose to the City People's Committee funding sources for departments, branches, and localities to overcome damage caused by natural disasters.
Propose that the City Military Command preside over and coordinate with the City Police, the City Border Guard Command and relevant units to deploy forces to support localities in responding to and overcoming consequences caused by natural disasters.
Upon receiving this document, we request that Heads of agencies, units and localities implement it.
Students in Hue city continue to have time off from school and take measures to ensure safety against floods.
On October 27, the Department of Education and Training of Hue city sent an official dispatch to schools and educational institutions in the city regarding the continued suspension of school for students in the entire city until further notice.
Faced with the complicated situation of floods and rains, the river water continues to rise, implementing the direction of the City Leaders on the conclusion at the flood prevention meeting on the morning of October 27, 2025, the Department of Education and Training directs:
1. Continue to let students in the whole city stay home from school until further notice.
2. Units continue to be on duty 24/24 hours, implementing the "Four on-site" motto, having plans to relocate assets, machinery, equipment, books, library documents, tables, chairs, and files to safe places to ensure no damage, breakage, or loss; maintain regular contact with authorities and local rescue forces to promptly respond in case of incidents. The on-duty unit opens schools to serve people taking shelter from floods when needed.
3. Because the time fund is in the active control phase, to ensure teaching quality, online teaching is only conducted for schools and students who meet the conditions.
If not guaranteed, make-up classes will be organized from the reserve time fund during the year and on Saturdays and Sundays after teaching conditions return to normal.
Encourage schools to strengthen communication with parents in assigning homework, reviewing lessons and updating flood situations, and helping parents manage students during and after floods, paying special attention to changes in terrain to instruct and guide students, as drowning accidents can easily occur after floods.
4. Closely monitor the weather situation as well as the direction of authorities at all levels and Department Leaders on means to proactively deploy cleaning activities, prepare schools after the flood to be ready to welcome students back to normal study.
Urgent telegram of the Chairman of Hue City People's Committee on proactively responding to rain, floods, flash floods, and landslides
From the night of October 25 to the morning of October 27, Hue city had heavy rain, some places had very heavy rain. Total rainfall from 1:00 p.m. on October 25 to 4:00 a.m. on October 27 was generally 250-450mm. Some places were higher such as Bach Ma Peak 1,426mm, Khe Tre 700mm, Huong Son 589mm, Thuong Quang 585mm, Huong Phu 574mm. The highest hourly rainfall was 104.6mm/hour at Nam Dong station in the period from 24:00 to 1:00 a.m. on October 27.
According to the forecast of the Hue City Hydrometeorological Station from the morning of October 27 to October 29, 2025, Hue City will continue to have heavy rain, very heavy rain, and some mountainous areas will have especially heavy rain. The total rainfall is generally 250-500mm, with some places over 700mm. The water level of rivers in the city is forecast to rise, with the Huong River and the Bo River rising above alert level III, and the flood situation is still complicated.
To be proactive and ready to respond to a combination of natural disasters early and from afar, and not be surprised, the Chairman of the People's Committee of Hue City requested:
1. Heads of departments, branches, sectors, units and Chairmen of People's Committees of communes and wards shall proactively organize close monitoring of forecast information and developments of floods and rains; promptly direct and deploy response work according to the "four on-the-spot" motto according to assigned tasks and authority, not to be passive or surprised in any situation that occurs.
Take full responsibility before the Chairman of the City People's Committee and the law if there is a lack of responsibility in leadership and direction leading to damage to the lives and properties of the People and the State.
2. The People's Committees of communes and wards continue to urgently deploy support for evacuation and relocation of people to safe places according to approved plans, prioritizing the safety of vulnerable groups (pregnant women, the elderly, children, people with disabilities, etc.).
Implement flood, inundation, and landslide response plans according to approved plans; absolutely do not allow vehicles or individuals to move on rivers, lakes, canals, etc., without ensuring safety or adequate safety equipment (life jackets, lifebuoys, and buoyancy materials).
Organize a review of the stockpiling of essential materials, vehicles, and goods, especially in areas that are often isolated by heavy rain and floods, remote areas; propagate to people to properly stockpile on-site to prevent rain and floods lasting for many days.
3. Dam and reservoir owners for irrigation and hydropower shall organize 24/7 on-duty shifts and continue to strictly implement reservoir operations to ensure water levels according to the provisions of Decision 1606/QD-TTg dated November 13, 2019 of the Prime Minister on promulgating the inter-reservoir operation process in the Huong River basin and the approved reservoir operation process, ensuring the safety of works and downstream areas.
4. The City Military Command, City Police and localities prepare rescue forces and vehicles to promptly deploy rescue when requested.
5. Relevant units and localities must organize a serious 24/7 on-duty shift, promptly report arising issues to the City Civil Defense Command, the City Military Command, the Department of Agriculture and Environment and implement the reporting regime in accordance with regulations.
Assign the City Civil Defense Command, the City Military Command, and the Department of Agriculture and Environment to continue monitoring and urging units and localities to seriously implement this Official Dispatch; promptly report to the City People's Committee, the Chairman of the City People's Committee, and the Vice Chairman of the City People's Committee in charge of any sudden or arising issues.
Source: https://baolamdong.vn/tin-lu-dac-biet-lon-canh-bao-mua-lon-lu-quet-sat-lo-dat-va-cac-chi-dao-khan-cap-ung-pho-398897.html






Comment (0)