Vietnam.vn - Nền tảng quảng bá Việt Nam

Erosion repair on Vinh Hao - Phan Thiet highway completed

On the afternoon of September 17, Mr. Pham Quoc Huy, Deputy Director of Project Management Board 7 (Ministry of Construction) said that the erosion locations on the Vinh Hao - Phan Thiet expressway (through Lam Dong province) have been handled, without affecting the roadbed and the overall quality of the project.

Báo Sài Gòn Giải phóngBáo Sài Gòn Giải phóng18/09/2025

According to Project Management Board 7, the cause of the above situation was due to the road maintenance unit removing the water barrier at the edge of the road, when there was prolonged heavy rain, it led to erosion at the edge of the highway. Relevant units have organized reinforcement and poured concrete at the eroded locations, ensuring safety for vehicles participating in traffic.

Source: https://www.sggp.org.vn/khac-phuc-xong-xoi-lo-tren-duong-cao-toc-vinh-hao-phan-thiet-post813495.html


Comment (0)

No data
No data

Same tag

Same category

Lost in the fairy moss forest on the way to conquer Phu Sa Phin
This morning, Quy Nhon beach town is 'dreamy' in the mist
Captivating beauty of Sa Pa in 'cloud hunting' season
Each river - a journey

Same author

Heritage

Figure

Enterprise

The 'great flood' on Thu Bon River exceeded the historical flood in 1964 by 0.14 m.

News

Political System

Destination

Product