Vietnam.vn - Nền tảng quảng bá Việt Nam

IC 13 intersection connecting Yen Bai city with Noi Bai highway opens to traffic

Báo Xây dựngBáo Xây dựng25/01/2025

The IC13 interchange project (section Km 122+800) of Noi Bai - Lao Cai expressway, with a total investment of more than 362 billion VND, officially came into operation at 5:00 p.m. this afternoon (January 25).


A representative of the Yen Bai Traffic Construction Investment Project Management Board said that from 5:00 p.m. on January 25 (ie the 26th of the Lunar New Year), IC 13 will be put into operation to serve the travel needs of the people.

Thông xe nút giao IC 13 nối TP Yên Bái với cao tốc Nội Bài - Lào Cai- Ảnh 4.
Thông xe nút giao IC 13 nối TP Yên Bái với cao tốc Nội Bài - Lào Cai- Ảnh 5.

Overview of IC 13 intersection officially put into operation at 5:00 p.m. on January 25.

IC13 Interchange Project of Noi Bai - Lao Cai Expressway (section Km 122 + 240), located in Au Lau Commune, Yen Bai City. The project was approved and adjusted by the Chairman of Yen Bai Provincial People's Committee on August 19, 2021 and October 7, 2022 with a total investment of 362 billion VND.

The project started construction in March 2023, constructed by a joint venture of Hanoi D&T Construction Investment Consulting Joint Stock Company - 307 Quang Phu Joint Stock Company - Elcom Telecommunication Technology Joint Stock Company.

After being put into operation, the interchange is expected to make travel from the provinces of Lao Cai, Phu Tho, Vinh Phuc to some localities of Yen Bai such as Tran Yen, Yen Bai city and western districts and towns such as Van Chan, Nghia Lo, Tram Tau, Mu Cang Chai more convenient.

According to the design, the project consists of 2 main items. The IC13 interchange includes the main branch road system (branch A) and 4 branches (B, C, D, E) connecting branch A with Noi Bai - Lao Cai expressway at Km 122 + 240.

Branch A has a length of 0.5 km, roadbed width of 23.5 m; branches B, C, D, E have a total length of 1.5 km, roadbed width of 8 m.

The system, lighting, road signs, and traffic safety guardrails have been fully installed. This is the third intersection from Noi Bai - Lao Cai Expressway into Yen Bai province.



Source: https://www.baogiaothong.vn/thong-xe-nut-giao-ic-13-noi-tp-yen-bai-voi-cao-toc-noi-bai-lao-cai-192250125122323035.htm

Comment (0)

Please leave a comment to share your feelings!

Same tag

Same category

Notre Dame Cathedral in Ho Chi Minh City is brightly lit to welcome Christmas 2025
Hanoi girls "dress up" beautifully for Christmas season
Brightened after the storm and flood, the Tet chrysanthemum village in Gia Lai hopes there will be no power outages to save the plants.
The capital of yellow apricot in the Central region suffered heavy losses after double natural disasters

Same author

Heritage

Figure

Enterprise

Dalat coffee shop sees 300% increase in customers because owner plays 'martial arts movie' role

News

Political System

Destination

Product