Vietnam.vn - Nền tảng quảng bá Việt Nam

Urgently and thoroughly repair the damaged road surface on National Highway 29

The Department of Construction has just issued a document requesting Project Management Board 7 to direct the contractor constructing the Chi Thanh - Van Phong component project, the section adjacent to National Highway 29, from Km34+510 - Km35+426, under the North - South Eastern Expressway Construction Project, phase 2021 - 2025 (project), to urgently and thoroughly repair damaged road surfaces, ensuring smooth operation of the above section with asphalt concrete.

Báo Đắk LắkBáo Đắk Lắk25/08/2025

The surface of Highway 29 is peeling, causing traffic insecurity.
The surface of Highway 29 is peeling, causing traffic insecurity.

The goal is to ensure traffic safety, meet the needs of safe travel of people, especially during the National Day holiday on September 2 and in the face of unusual weather developments in the last months of the year. If this work is delayed or the above contents are not implemented, leading to traffic accidents and construction incidents, Project Management Board 7 and the construction contractor will be responsible before the law.

Also according to the Department of Construction, in the granted license, during the construction process, the contractor must ensure absolute traffic safety, not affecting the quality of traffic works and existing underground and above-ground works on the route. However, currently, the road surface of the above-mentioned route is being temporarily repaired by Project Management Board 7 with crushed stone aggregate, some locations have been peeled off, damaged again, forming potholes, stagnant water on the surface and roadside, causing unsafety for passing vehicles.

Source: https://baodaklak.vn/kinh-te/202508/khan-truong-khac-phuc-triet-de-hu-hong-mat-duong-tren-quoc-lo-29-48107aa/


Comment (0)

Please leave a comment to share your feelings!

Same tag

Same category

Notre Dame Cathedral in Ho Chi Minh City is brightly lit to welcome Christmas 2025
Hanoi girls "dress up" beautifully for Christmas season
Brightened after the storm and flood, the Tet chrysanthemum village in Gia Lai hopes there will be no power outages to save the plants.
The capital of yellow apricot in the Central region suffered heavy losses after double natural disasters

Same author

Heritage

Figure

Enterprise

Dalat coffee shop sees 300% increase in customers because owner plays 'martial arts movie' role

News

Political System

Destination

Product

Footer Banner Agribank
Footer Banner LPBank
Footer Banner MBBank
Footer Banner VNVC
Footer Banner Agribank
Footer Banner LPBank
Footer Banner MBBank
Footer Banner VNVC
Footer Banner Agribank
Footer Banner LPBank
Footer Banner MBBank
Footer Banner VNVC
Footer Banner Agribank
Footer Banner LPBank
Footer Banner MBBank
Footer Banner VNVC