Vietnam.vn - Nền tảng quảng bá Việt Nam

Cam Lam - Vinh Hao Expressway will collect tolls in 4 days

Báo Tuổi TrẻBáo Tuổi Trẻ24/05/2024

From 0:00 on May 28, Cam Lam - Vinh Hao Expressway will collect service usage fees, the fees are divided into 5 groups, the highest is 497,000 VND.
Cao tốc Cam Lâm - Vĩnh Hảo chính thức thông xe từ ngày 26-4 - Ảnh: DUY NGỌC

Cam Lam - Vinh Hao Expressway officially opened to traffic on April 26 - Photo: DUY NGOC

On May 23, a representative of Cam Lam - Vinh Hao Expressway Joint Stock Company said that this expressway (through three provinces of Khanh Hoa, Ninh Thuan and Binh Thuan ) will officially collect service fees.

Fees are divided into 5 groups
Mức phí trên tuyến cao tốc Cam Lâm - Vĩnh Hảo - Ảnh: DUY NGỌC

Toll rates on Cam Lam - Vinh Hao expressway - Photo: DUY NGOC

The fees are divided into 5 groups. Specifically, group 1 (vehicles with less than 12 seats, trucks with a load capacity of less than 2 tons; public passenger buses): fees range from 24,000 VND to 130,000 VND.

Group 2 (vehicles with 12 to 30 seats; trucks with a load capacity of 2 tons to under 4 tons): fee from 31,000 VND to 170,000 VND.

Group 3 (vehicles with 31 seats or more; trucks with a load capacity of 4 tons to less than 10 tons): fee from 41,000 VND to 222,000 VND.

Group 4 (trucks with a load capacity from 10 tons to under 18 tons; trucks carrying goods in 20-foot containers): fee from 65,000 VND to 353,000 VND.

Group 5 (trucks with a load capacity of 18 tons or more; trucks carrying goods in 40-foot containers): fee from VND 92,000 to VND 497,000.

Cam Lam - Vinh Hao Expressway collects tolls with inter-route ETC system

Cam Lam - Vinh Hao Expressway officially opened to traffic on April 26 and was inaugurated on April 28. Since the opening, vehicles traveling on the route have not paid any tolls.

Cam Lam - Vinh Hao Expressway Phase 1 has a modern ITS system, integrating both the road and Nui Vung tunnel.
Nút giao Du Long trên tuyến cao tốc Cam Lâm - Vĩnh Hảo - Ảnh: DUY NGỌC

Du Long intersection on Cam Lam - Vinh Hao expressway - Photo: DUY NGOC

The ETC system is interconnected with open inputs (no barriers), toll collection data at stations is connected and synchronized to the toll monitoring center to ensure complete and transparent toll collection.

There are 4 toll stations on the route including: 1 Du Long toll station (Du Long intersection Km70+194), 2 Phan Rang toll stations (Phan Rang intersection Km92+815) and 1 toll station on the main route (Km133+770).

Duy Ngoc - Tuoitre.vn

Source: https://tuoitre.vn/4-ngay-nua-cao-toc-cam-lam-vinh-hao-se-thu-phi-20240523181758791.htm

Comment (0)

No data
No data
Magical scene on the 'upside down bowl' tea hill in Phu Tho
3 islands in the Central region are likened to Maldives, attracting tourists in the summer
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?
Taste of the river region

Heritage

Figure

Business

No videos available

News

Political System

Local

Product