Vietnam.vn - Nền tảng quảng bá Việt Nam

Ministry of Industry and Trade deploys '4 on-site' measures to respond to floods in Central Vietnam

(Chinhphu.vn) - The Ministry of Industry and Trade has just issued an urgent dispatch on proactively responding to floods in the Central region.

Báo Chính PhủBáo Chính Phủ04/12/2025

Bộ Công Thương triển khai '4 tại chỗ' ứng phó với mưa lũ miền Trung- Ảnh 1.

The Ministry of Industry and Trade requires units to prepare response plans for unusual and emergency situations according to the "4 on-site" motto - Illustrative photo

According to the bulletin of the National Center for Hydro-Meteorological Forecasting, from the evening of December 3 to the end of the night of December 4, the area from South Quang Tri to Da Nang city and the east of Quang Ngai province will have moderate rain, heavy rain with common rainfall from 70-150 mm, locally very heavy rain over 250 mm. From the evening of December 3 to the end of December 4, the east of the provinces from Gia Lai to Dak Lak and Khanh Hoa will have moderate rain, heavy rain with common rainfall from 40-90 mm, locally very heavy rain over 150 mm. From the night of December 4, heavy rain will gradually decrease. Warning of the risk of heavy rain (>100 mm/3 hours).

To proactively respond to the complicated developments of the flood situation in the Central region, the Minister of Industry and Trade requested the Department of Industry and Trade of provinces and cities to direct hydropower dam owners in the area to strictly implement the reservoir operation procedures approved by competent authorities, closely monitor the hydrometeorological situation, the development of rain, floods, natural disasters and the actual situation to promptly develop a reasonable reservoir water regulation plan to ensure safety for works and residents in downstream areas; strengthen inspection of the operation to ensure the safety of dams and hydropower reservoirs, promptly detect points at risk of landslides to put up warning signs, closely coordinate with local authorities to promptly inform, ensure safety for people, especially in emergency flood discharge situations.

At the same time, urgently review deeply flooded areas along rivers and streams, areas at risk of flash floods, landslides, and isolated areas to promptly have specific plans for stockpiling and supplying goods, ensuring the availability of essential goods, especially food, drinking water, and necessities to serve people in disaster-stricken areas, especially households in isolated areas. Do not let shortages of essential goods to serve the people occur.

Organize review and develop plans to reserve and supply essential goods; be ready to regulate goods sources (food, drinking water, fuel, medicine) to isolated areas, to prevent shortages of essential goods to serve the people.

Direct market management forces to strengthen market inspection and control; promptly handle violations related to speculation, hoarding, and sudden price increases.

The Ministry of Industry and Trade requested Vietnam Electricity Group to direct the Central Power Corporation and provincial power companies to concentrate all necessary forces, means and materials to overcome the damage caused by the recent floods; ensure safe electricity supply for production and daily life of people in affected areas.

At the same time, direct hydropower dam owners under their management to seriously implement the inter-reservoir operation process and the reservoir operation process approved by competent authorities; closely monitor the hydrological situation, promptly report to competent authorities to flexibly adjust the reservoir operation regime to cut and reduce floods for the downstream area of ​​the dam; be prepared and concentrate all resources to promptly overcome any incidents that occur.

For owners, management and operation units of hydropower projects, the Ministry of Industry and Trade requires 24/7 command and disaster prevention on-duty organizations, regularly update and promptly report to competent authorities on the operation status of the project, especially in unusual and emergency situations according to regulations.

Closely monitor the developments of rain and floods, inflow to the lake, water levels upstream and downstream of the reservoir to promptly report to the National Civil Defense Steering Committee, the Ministry of Industry and Trade's Civil Defense Command and relevant agencies as prescribed.

Review the information system to warn people in the downstream area when releasing floodwaters, ensuring stable operations in all natural disaster situations. Closely coordinate with the Civil Defense Command and local authorities at all levels in the area affected by the project, including information work on flood regulation and warning of flood discharges, to avoid unfortunate damage.

Strictly comply with the single reservoir operation process and the inter-reservoir operation process approved by the competent authority and directed by the Chairman of the Provincial People's Committee and Head of the Provincial Civil Defense Command in flood cutting, flood reduction and flood delay for downstream areas.

Prepare response plans for unusual and emergency situations according to the "4 on-the-spot" principle to promptly deploy in any natural disaster situation.

Anh Tho


Source: https://baochinhphu.vn/bo-cong-thuong-trien-khai-4-tai-cho-ung-pho-voi-mua-lu-mien-trung-102251204092050071.htm


Comment (0)

Please leave a comment to share your feelings!

Same tag

Same category

Notre Dame Cathedral in Ho Chi Minh City is brightly lit to welcome Christmas 2025
Hanoi girls "dress up" beautifully for Christmas season
Brightened after the storm and flood, the Tet chrysanthemum village in Gia Lai hopes there will be no power outages to save the plants.
The capital of yellow apricot in the Central region suffered heavy losses after double natural disasters

Same author

Heritage

Figure

Enterprise

Dalat coffee shop sees 300% increase in customers because owner plays 'martial arts movie' role

News

Political System

Destination

Product

Footer Banner Agribank
Footer Banner LPBank
Footer Banner MBBank
Footer Banner VNVC
Footer Banner Agribank
Footer Banner LPBank
Footer Banner MBBank
Footer Banner VNVC
Footer Banner Agribank
Footer Banner LPBank
Footer Banner MBBank
Footer Banner VNVC
Footer Banner Agribank
Footer Banner LPBank
Footer Banner MBBank
Footer Banner VNVC