
Accordingly, the building has a construction area of 457.4 m² , with a total floor area of approximately 1,730 m² spread across 4 floors. The first floor includes a motorbike parking area, lobby, staircase, reception room, two emergency staircases, three technical rooms, and restrooms. The second floor features an open atrium and staircase, waiting area, ticket counter, beverage counter, technical room, two emergency staircases, and restrooms. The third floor houses screening room 1 with 131 seats and a projection room, a VIP screening room with 44 seats, a technical room, two emergency staircases, and restrooms. The fourth floor houses screening room 2 with 180 seats, three offices, a technical room, two emergency staircases, and restrooms.

Regarding the staircases, the Department of Culture, Sports and Tourism and the sponsoring unit proposed two design options: a rectangular staircase and a circular staircase.
In order to have a basis for the early construction of the Thong Nhat cinema, the Department of Culture, Sports and Tourism requests relevant agencies and units, according to their functions and duties, to provide guidance on the implementation before August 15th.
PVSource: https://baohaiduong.vn/de-xuat-phuong-an-xay-dung-rap-chieu-phim-thong-nhat-tp-hai-duong-cao-4-tang-389413.html






Comment (0)