Vietnam.vn - Nền tảng quảng bá Việt Nam

Cannons ready to welcome the April 30th ceremony at Bach Dang wharf

15 cannons deployed at Bach Dang wharf area (District 1) will fire 21 cannon shots to the Vietnamese National Anthem on the occasion of the 50th Anniversary of National Reunification Day.

VietNamNetVietNamNet08/04/2025

W-fireworks HCMC 13.jpg

On the morning of April 7th, 15 cannons were fully installed on a red carpet along the Saigon River (Bach Dang Wharf area). This is one of the key events of the 50th anniversary celebration of the reunification of the country.

W-fireworks HCMC 5.jpg

The cannons are positioned in the park, opposite Nguyen Hue pedestrian street, to ensure unobstructed views and a solemn atmosphere, while also allowing locals and tourists to visit.

W-fireworks HCMC 8.jpg

Fifteen 105 mm cannons, each weighing approximately 4-5 tons.

W-fireworks HCMC 4.jpg

These cannons will fire 21 cannon shots to the tune of the Vietnamese national anthem during the 50th anniversary celebration of the country's reunification.

W-fireworks HCMC 16.jpg

The area surrounding the artillery emplacement is carefully fenced off and strictly controlled, ensuring absolute security throughout the entire preparation process. Currently, people are allowed to take souvenir photos with the cannons but are not permitted to approach or touch the artifacts.

W-fireworks HCMC 9.jpg

According to technical requirements, the artillery position must be placed on a stable, level surface to create a uniform explosion when fired. A soldier is checking for alignment.

W-fireworks HCMC 15.jpg

Alongside the artillery installation, supporting tasks such as setting up temporary tents are also underway.

W-fireworks HCMC 6.jpg

According to the plan, the 50th anniversary of the reunification of the country will be celebrated solemnly with a parade and march bringing together approximately 13,000 participants, a 21-gun salute to the tune of the Vietnamese national anthem, and a welcoming flight by the air force with helicopters, Yak-130s, and Su-30MK2s.

To facilitate the installation process, five roads will be closed to traffic from 9 PM to midnight or 3 AM the following morning, from April 7th to 26th. On April 27th and 30th, traffic will be restricted during the day.

VN (according to Vietnamnet)


Source: https://baohaiduong.vn/dan-dai-bac-san-sang-don-dai-le-30-4-tai-ben-bach-dang-408888.html


Comment (0)

Please leave a comment to share your feelings!

Same tag

Same category

Christmas entertainment spot causing a stir among young people in Ho Chi Minh City with a 7m pine tree
What's in the 100m alley that's causing a stir at Christmas?
Overwhelmed by the super wedding held for 7 days and nights in Phu Quoc
Ancient Costume Parade: A Hundred Flowers Joy

Same author

Heritage

Figure

Enterprise

Vietnam is the world's leading Heritage Destination in 2025

News

Political System

Destination

Product