Technical staff of Trung Son Hydropower Company Limited repair and maintain the EPP emergency warning system.
Since the beginning of the year, Trung Son Hydropower Company has developed a disaster prevention and control plan that closely follows extreme weather scenarios; comprehensively inspects and maintains the dam system, reservoirs, monitoring equipment, electromechanical systems and warnings.
The company has increased coordination with local authorities in downstream areas such as Trung Son and Trung Thanh to review and disseminate flood response plans and instruct people to be ready to evacuate.
Company officers and employees participate in the PCTT & TKCN drill in 2025.
The PCTT&TKCN Command Board and the shock troops of Trung Son Hydropower Company Limited have been strengthened, organized regular drills close to reality, and improved the ability to handle situations. The SCADA system, rain gauge stations, flow measuring equipment and communication equipment are maintained in operation 24/7; weather information is regularly updated from the Northern Hydrometeorological Station, ensuring timely warnings through multiple channels for proactive response, safe operation, and stable power supply to the national grid.
Trung Sinh (CTV)
Source: https://baothanhhoa.vn/thuy-dien-trung-son-chu-dong-ung-pho-bao-dam-van-hanh-an-toan-trong-mua-mua-bao-nam-2025-258233.htm
Comment (0)