Vietnam.vn - Nền tảng quảng bá Việt Nam

Potholed BOT Road in Dong Nai: Repaired with Public Funds

Báo Tuổi TrẻBáo Tuổi Trẻ01/07/2024


Tuyến đường Nhà máy nước Thiện Tân thuộc dự án BOT đường ĐT 768 xuống cấp trầm trọng, đầy ổ gà, ổ voi - Ảnh: A LỘC

Thien Tan Water Plant road under the BOT project of DT 768 road is seriously degraded, full of potholes - Photo: A LOC

On July 1, the People's Committee of Dong Nai province issued a document on the repair and handover of the management of the Thien Tan Water Plant road, which is seriously degraded and full of potholes.

Thien Tan Water Plant route (Hoang Van Bon - Thien Tan road) belongs to the BOT project of DT 768 road, invested by Sonadezi Chau Duc Joint Stock Company.

Previously, Dong Nai Provincial People's Committee approved the adjustment of the investment policy for the BOT project of DT 768 road. In particular, the Thien Tan Water Plant route was removed from the BOT project.

To ensure urgent traffic safety and environmental sanitation on the Thien Tan Water Plant route, Dong Nai Provincial People's Committee approved the policy of repairing the above route using transportation career capital.

Dong Nai Provincial People's Committee assigned the Department of Transport as the investor, the Department of Finance to preside over balancing and arranging career capital for the Department of Transport to implement.

Regarding Sonadezi Chau Duc Joint Stock Company's proposal to hand over the management of Thien Tan Water Plant route, Dong Nai Provincial People's Committee also assigned the Department of Transport to preside over, coordinate with relevant units to advise and propose to the Provincial People's Committee for handling.

In addition, Dong Nai Provincial People's Committee requested Sonadezi Chau Duc Joint Stock Company to urgently complete the adjustment dossier of the BOT project on DT 768 road, submit it to the Department of Planning and Investment for appraisal, submission and approval according to regulations.

Tuyến đường được đưa ra khỏi dự án BOT và sửa chữa bằng nguồn vốn ngân sách - Ảnh: A LỘC

The route was removed from the BOT project and repaired with budget funds - Photo: A LOC

As reported, the Hoang Van Bon - Thien Tan route is more than 6km long, starting at National Highway 1 (Tan Bien Ward, Bien Hoa City) connecting to DT 768 (Thien Tan Commune, Vinh Cuu District). This is also the route connecting to Binh Duong province via Thu Bien Bridge.

During the field trips, Tuoi Tre Online witnessed firsthand the suffering of the people and drivers going in and out of Hoang Van Bon Street. Motorbikes, trucks, and passenger cars inched along, teetering on the mud.

According to records, the BOT road is about 1.4km long, from the intersection of National Highway 1 to the intersection with Nguyen Truong To Street, there are hundreds of potholes. The road surface is peeling, bumpy, and muddy like a trap for road users.



Source: https://tuoitre.vn/duong-bot-day-o-ga-o-dong-nai-sua-chua-bang-nguon-von-su-nghiep-20240701160148791.htm

Comment (0)

No data
No data
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?
Taste of the river region
Beautiful sunrise over the seas of Vietnam
The majestic cave arc in Tu Lan

Heritage

Figure

Business

No videos available

News

Political System

Local

Product