Vietnam.vn - Nền tảng quảng bá Việt Nam

Thanh Hoa, Tay Ninh Planning: Route of 2 new roads

Two new routes are expected to be deployed in Thanh Hoa commune, Tay Ninh province according to the land use planning for the 2021-2030 period, promising to improve the area's traffic infrastructure.

Báo Lâm ĐồngBáo Lâm Đồng06/12/2025

Overview of traffic planning of Thanh Hoa commune

According to the land use planning adjustment map for the period 2021 - 2030 of the old Thanh Hoa district, Thanh Hoa commune will have a number of new roads opened to complete the traffic network and promote socio -economic development. Of which, there are two notable routes with the role of connecting important roads and residential areas.

Thanh Hoa commune is geographically adjacent to Thanh Phuoc, Tan Tay, Tan Phuoc 1, Tan Phuoc 2 and Tan Thanh communes, creating favorable conditions for regional connectivity through new infrastructure projects.

Geographical location map of Thanh Hoa commune, Thanh Hoa district, Long An province.
Thanh Hoa commune is one of the administrative units of the old Thanh Hoa district. In terms of geographical location, the north of Thanh Hoa commune borders Thanh Phuoc commune; the east borders Tan Tay commune; the south borders Tan Phuoc 1, Tan Phuoc 2 and Tan Thanh communes; the west borders Tan Thanh commune.

Details of 2 routes that will open in the future

Below are details of the two routes shown in the plan, based on the adjusted map of the old Thanh Hoa district.

1. The route is perpendicular to Duong Van Duong canal

This route is expected to be approximately 2.2 km long. According to the planning diagram, the route is almost perpendicular to Duong Van Duong canal, running through the area near Pho Huong pagoda. When formed, this route is expected to create a new traffic axis, supporting travel and transport of goods for people in the area.

Diagram of planning the perpendicular route of Duong Van Duong canal on land use map.
The road will be opened according to the planning in Thanh Hoa commune according to the adjusted land use planning map for the period 2021 - 2030 of the old Thanh Hoa district. (Green line).
Actual location of the perpendicular route to Duong Van Duong canal on satellite map.
Route map will be opened according to planning in Thanh Hoa commune. (Photo taken from Google Map).

2. Route connecting Provincial Road 836B and National Highway 62

The second route is shorter, about 750 m in length. The highlight of this route is the ability to directly connect two important roads. One end of the route will intersect with Provincial Road 836B, while the other end will head towards National Highway 62. The opening of this route will help shorten the travel distance and strengthen the connection between the provincial road network and the national highway through the commune.

Planning diagram of the connecting route of Provincial Road 836B on land use map.
The road will be opened according to the planning in Thanh Hoa commune according to the adjusted land use planning map for the period 2021 - 2030 of the old Thanh Hoa district. (Green line).
Actual location of Provincial Road 836B connection route on satellite map.
Route map will be opened according to planning in Thanh Hoa commune. (Photo taken from Google Map).

Note: The diagrams in the article are drawn relatively based on the Land Use Planning Adjustment Map for the period 2021 - 2030 of the old Thanh Hoa district. Planning information may change in the future according to the decisions of the competent authorities.

Source: https://baolamdong.vn/quy-hoach-thanh-hoa-tay-ninh-lo-trinh-2-tuyen-duong-moi-408571.html


Comment (0)

Please leave a comment to share your feelings!

Same tag

Same category

Overwhelmed by the super wedding held for 7 days and nights in Phu Quoc
Ancient Costume Parade: A Hundred Flowers Joy
Bui Cong Nam and Lam Bao Ngoc compete in high-pitched voices
Vietnam is the world's leading Heritage Destination in 2025

Same author

Heritage

Figure

Enterprise

Knock on the door of the fairyland of Thai Nguyen

News

Political System

Destination

Product

Footer Banner Agribank
Footer Banner LPBank
Footer Banner MBBank
Footer Banner VNVC
Footer Banner Agribank
Footer Banner LPBank
Footer Banner MBBank
Footer Banner VNVC
Footer Banner Agribank
Footer Banner LPBank
Footer Banner MBBank
Footer Banner VNVC
Footer Banner Agribank
Footer Banner LPBank
Footer Banner MBBank
Footer Banner VNVC